BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bremerton, Washington. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City will be hiring a professional services firm to provide construction management (CM) services for Bremertons KITSAP LAKE PARK RENOVATION PROJECT. This project is currently out to bid, and we anticipate the Notice to Proceed to be issued in late June with construction to start in July. DESCRIPTION OF CONTRACT WORK The Kitsap Lake Park Renovation Project is divided into seven schedules. Proposal should include a cost for CM services on Schedules A.1, B, & C (if project needs to be phased) and an overall cost for the entire work (Schedules A.1-F). Schedule A.1 - Demolition, earthwork, curbing, concrete walkways, concrete slabs, block walls, asphalt pavement, striping, signing, steel piles, fishing float, prefabricated fixed pier and gangway, and outdoor shower. Schedule A.2 - Demolition, earthwork, infiltration trench, concrete walkways, concrete slabs, asphalt pavement, striping, signing, and pre-engineered owner provided picnic shelter. Schedule B - Demolition, earthwork, curbing, concrete walkways, concrete slabs, asphalt pavement, striping, boat ramp, boat ramp float, and steel piles. Schedule C - Earthwork, storm berm, storm sewer and treatment vault. Schedule D - Demolition, earthwork, construction of subdrains, curbing, concrete walkways, concrete slabs, stairs, and seat wall. Schedule E - Bid alternative substituting commercial HMA instead of concrete walkways. Schedule F - Bid additive for powder coat finish on stair and ramp railings. The construction Notice to Proceed (NTP) is anticipated to be issued in late June with construction anticipated to start in July and completed within 70 working days. The agreement with the professional services firm will be executed before the construction NTP is issued. These working days may not be sequential *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions may be submitted to the Project Administration Contact and must be submitted no later than May 17 th , 2024. Answers will be provided in a future addendum

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,600,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
89
Bidding Soon
2,324
All Active Projects
706
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 24, 2024

January 24, 2025

May 6, 2025

img_map_placeholder

1978 Price Rd NW, Bremerton, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.