Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 6, 2025 at 7:00 PM
Updated October 1, 2024
Renovation of a clubhouse / community center in Edison, New Jersey. Completed plans call for the renovation of a clubhouse / community center.
HVAC Infrastructure Upgrades-Senior Rec Center The Purposes of these contract are as per the following: Demolition includes the existing boiler, boiler flue, expansion tank, Air Separator, Piping, Valves, hangers, supports and duct work, etc.; and two existing air handlers, associated condensers, and all associated piping, power, supports, controls, etc. Remove existing pumps, ducts, and all controls and appurtenances. Remove Ultraviolet lights located in existing air handlers and turn it to the owner. Take down ceiling, lights, sprinklers, etc. as required to installation of equipment, piping, and ductwork. Install two new air handlers in existing unit locations. Connect to existing ductwork and piping. Modify ductwork as required to support installation. Make all connections and install all accessories and appurtenances as specified. Provide outdoor condensing units on existing concrete pad. Modify fence as required for installation and maintain all required clearances. Install new boiler, as specified. Provide electrical disconnects and reconnects as required for the new equipment, existing duct mounted smoke detector in return ductwork to remain. Remove existing electrical equipment associated with duct mounted UV light. Turn UV light to owner. Temporarily remove all electrical items in ceiling as required to accommodate scope of work. Reinstall upon completion of work. Equipment to be installed includes air-handling units, boiler, pumps, controls, etc. Provide emergency power off switch for boiler. Project is to be completed in 180 calendar days after contract award and receipt of the notice to proceed. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27-1 et seq. Project is to be completed in 180 calendar days after contract award and receipt of the notice to proceed. Question Deadline 03/19/2025
GC Bidding
Clubhouse / Community Centers
$700,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2025
April 25, 2025

2963 Woodbridge Ave, Edison, NJ
Related To This Project
Edison, NJ
Bid Date: Jun 12 2024
Edison, NJ
Bid Date: Jun 11 2024
Edison, NJ
Bid Date: Nov 08 2024
Edison, NJ
Bid Date: Jun 11 2024
Edison, NJ
Bid Date: Jun 13 2024
Edison, NJ
Bid Date: Jul 09 2024
Edison, NJ
Bid Date: Jul 02 2024
Edison, NJ
Bid Date: Jun 25 2024
Edison, NJ
Bid Date: May 30 2024
Edison, NJ
Bid Date: Jun 12 2024
Edison, NJ
--
Edison, NJ
Bid Date: May 07 2024
Edison, NJ
Bid Date: Jul 09 2024
Edison, NJ
--
Edison, NJ
Bid Date: May 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.