EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 17, 2024 at 8:00 PM

Updated October 1, 2024

Demolition, site work, paving, asbestos abatement, new construction and renovation of a mixed-use development in North Chicago, Illinois. Completed plans call for the demolition of a educational facility; for the construction of a 102,000-square-foot educational facility; for the renovation of a educational facility; for site work for a educational facility; for asbestos abatement for a educational facility; road / highway; and for paving for a road / highway.

New elementary school (102,000 sq. ft.) and other Work indicated in the Contract Documents. BID GROUP 1: Bid Packages: 1 - Demolition & Abatement, 2 - Site Excavation, 3 - Site Utilities, 4 - Concrete & Damproofing , 5 - Asphalt Paving, 6 - Precast, 7 - Structural Steel and Misc Metals, 8 - Masonry & Air Vapor Barrier, 9 - Millwork, 10 - Drywall, 11 - Ceilings, 12 - Flooring, 13 - Cermic Tile, 14 - Polished Concrete, 15 - Painting, 16 - Glazing, 17 - Roofing, 18 - Metal Panels, 19 - Mechanical, 20 - Electrical, 21 - Solar Panels, 22 - Plumbing, 23 - Fire Suppression, 24 - General Trades, 25 - Food Service, 26 - Landscaping All bids must be submitted in accordance with the bidding instructions contained in the Bidding Documents for the project. Bid security in the form of a bid bond in an amount equal to ten percent (10%) of the base bid amount shall be submitted with the bid. The bond shall be payable to the North Chicago School District 187, 2000 Lewis Avenue, North Chicago IL 60064. All documents and information required by the bidding instructions contained in the Bidding Documents for the project shall be submitted with the bid Incomplete, late or non-conforming bids will not be accepted. No bids shall be withdrawn, cancelled or modified after the time for opening of bids without the Board's consent for a period of sixty (60) days after the scheduled time of bid opening. The Board reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities. Bids shall be awarded to the lowest responsible bidder, considering conformity with specifications, terms of delivery, and quality and serviceability, as determined by the Board. Any such decision shall be considered final. Interested parties may inspect the existing conditions and site logistics. The successful bidders shall comply with the provisions of the Illinois Prevailing Wage Act, specifically including the payment of the applicable prevailing wages to all laborers, workers, and mechanics performing work under the contract. If during the time period of the work, the prevailing wage rates change, the contractor shall be responsible for additional costs without any change to the contract amount. All bidders must comply with the Illinois Statutory requirements regarding labor, including Equal Employment Opportunity Laws. Should the bidder require additional information about this bid, submit questions via email to: Hannah Reagan via hreagan@bulley.com. Questions are required no later than July 9th, 2024.

Post-Bid

Educational

$22,000,000.00

Public - City

Asbestos Abatement, Demolition, New Construction, Paving, Renovation, Site Work

288

46

254

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Fabricator Qualifications, Installer Qualifications, Mockups, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete, Tilt-Up Concrete, Cast Decks and Underlayment, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Acoustical Panel Ceilings, Flooring, Flooring Treatment, Specialty Flooring, Resilient Flooring, Static-Control Resilient Flooring, Terrazzo Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Panel Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Athletic Field Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Furnishing Accessories, Clocks, Rugs and Mats, Furniture, Seating, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Wheelchair Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes, Trash Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, Air Outlets and Inlets, Central Heating Equipment, Heat Exchangers for HVAC, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Engine Generators, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Schedules for Communications, Schedules for Structured Cabling and Enclosures, Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Bases, Ballasts, and Paving, Rigid Paving, Curbs and Gutters, Site Improvements, Screening Devices, Irrigation, Planting, Planting Preparation, Mulching, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Storage Tanks, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps, Hooks, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
174
Bidding Soon
2,516
All Active Projects
1,103
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2024

September 13, 2024

img_map_placeholder

2833 Washington Ave, North Chicago, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

North Chicago SD 187 - New Forrestal Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.