BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2024 at 8:00 PM

Updated November 13, 2025

Demolition, site work, paving, outdoor lighting and new construction of a transportation facility in Valdosta, Georgia. Working plans call for the demolition of a transportation facility; for the construction of a transportation facility; for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

**As of July 8, 2024, project will rebid. No definite date for the rebid.** This project generally consists of construction of a new general aviation terminal building, landside sitework, and aircraft apron reconstruction and widening at the Valdosta Regional Airport. The Base Bid for the Project includes the general aviation terminal building, new entry roadway modifications, parking, utilities, fencing and other site improvements. The Base Bid will also include demolition of the existing General Aviation Terminal Building upon completion of the new building. Additive Alternate Bid No. 1 includes the aircraft apron reconstruction and widening utilizing an asphalt pavement section for all new pavements, as well as grading, base course, storm drainage, erosion control and airfield edge lighting and airfield signage. Additive Alternate Bid No. 2 includes the aircraft apron reconstruction and widening utilizing a concrete pavement section for the apron reconstruction and an asphalt pavement section for the apron widening, as well as grading, base course, storm drainage, erosion control and airfield edge lighting and airfield signage. Bid security in the form of a bid bond equal to 5% of the total bid is required. Bidders must submit bids for all Bid Items. Contract security in the form of 100% Performance and Payment Bonds will be required. FAA A.I.P. No. 3-13-0115-0xx-202x Project No. 3-13-0115-045-2023, 24065, GA2201 Question Deadline 06/17/2024 at 5:00 PM ET Address all questions to: Chris Lowery at clowery@holtconsultingco.com

Final Planning

Transportation Terminals

$1,000,000.00

Public - County

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

192

34

226

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
39
Bidding Soon
573
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

January 8, 2025

Project location map

2626 Madison Hwy, Valdosta, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.