Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Columbus, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
All contractors, subcontractors, and bidders for contracts with the City of Columbus shall be required to complete and submit a notarized Comprehensive Compliance Form (CCF) regarding requirements as to Affirmative Action, Disqualification of Contracts Dealing with the Government of Iran, a Drug Free Workplace, OSHA and IOSHA Regulations, and Employment Eligibility Verification. The Comprehensive Compliance Form encompassing all of the provisions stated above will be available in the Bid Event and be required with each Bid Response. If awarded the contract, said provisions in the CCF will be incorporated into the final contract. Failure to submit the CCF will constitute a material defect in the bid. In addition, a breach of a covenant in the CCF may be considered a material breach of any final contract. The City of Columbus exclusively uses Ion Wave for the notification and dissemination of all solicitations. The receipt of solicitations through any other means may result in the receipt of incomplete specifications and/or addendums, which could ultimately render the bid/proposal non-compliant. The City of Columbus accepts no responsibility for the receipt and/or notification of solicitations through any other means. A one hundred percent (100%) performance and payment bond will be required of the successful bidder. It is intended that actual construction of all work divisions shall be started as soon as practicable, and each bidder shall be prepared to enter promptly into a construction contract, furnish a performance bond, furnish a certificate of insurance, and begin work without delay. No bidder may withdraw any bid or proposal within a period of thirty (30) days following the date set for receiving bids or proposals. The Board of Public Works and Safety reserves the right to waive informalities and reserves the right to reject and/or cancel any and all bids, solicitations and/or offers in whole or in part as specified in the solicitations when it is not in the best interests of the governmental body as determined by the purchasing agency in accordance with I.C. 5-22-18-2. Questions Deadline: 5/24/2024 12:00 PM (ET) A bid bond or certified check in the amount of ten percent (10%) of the bid amount, and made payable to the City of Columbus, Indiana, is required with each Bid Response as guaranty that the terms of the bid will be carried out. Bid Security should be submitted by uploading a clean digital copy to the Bid Response. The apparent low bidder will be required to furnish the original bid bond to the Finance Department's Office in City Hall, within 72 hours of bid opening. All bonds must be secured from a bonding company as listed in the current edition of the U.S. Treasury Department, Circular #570, and authorized to transact business in the State of Indiana. The bid bond must include a power of attorney for the agent signing the bid bond. The Board of Public Works and Safety reserves the right to reject any and all bids. 1. Contractor shall attempt to facilitate the City of Columbus Transit system by keeping them on time. They operate on a scheduled route based on time. 2. From the moment existing ramp and sidewalk removal begins, the contractor has 5 calendar days to replace that ramp and sidewalk. 3. Contractor shall coordinate with homeowners to protect existing irrigation systems during construction. Contractor is responsible for any repairs to existing irrigation systems damaged during the project. 4. Contractor shall complete Par 3 Drive by July 31, 2024. 5. Contractor shall complete cross gutter work on Gladstone Ave. by July 31, 2024 and only one side street closure is to be permitted at a time Completion- October 18, 2024 1 - Lafayette Ave. - 2nd St. to LIRC Railroad Crossing (300' South of 1st St.) 1 1.5" Milling 1960 SYD 2 6" 25mm Base Patching 200 TON 3 1 1/2" 9.5 mm Surface 175 TON 4 2' Curb & Gutter 75 LFT 5 Continental Bars, 24", Thermoplastic 150 LFT 6 Thermoplastic, Stop Bar 15 LFT 7 Thermoplastic, RR Assembly 2 EACH 8 Mobilization 2 - Westwood Blvd. - State Road 46 to Pine Ridge Dr. 1 6" Milling 1515 SYD 2 1 1/2" 9.5 mm Surface 130 TON 3 4.5" 25mm Base 400 TON 4 Remove & Replace Concrete Walk 3 SYD 5 ADA Compliant Ramps 12 SYD 6 Common Excavation 74 CYD 7 #53 Compacted Aggregate Type "O" 12" 150 TON 8 Geogrid Tensar H Series NX850 220 SYD 9 Lane Lines, Thermoplastic 60 LFT 10 Crosswalk 6" Thermoplastic 48 LFT 11 Stop Bar, Thermoplastic 12 LFT 12 Mobilization 3 - Pine Ridge Dr. - Westwood Blvd. to CR 350 W 1 6" Milling 4000 SYD 2 1 1/2" 9.5 mm Surface 320 TON 3 4.5" 19mm Intermediate 950 TON 4 2' Roll curb & Gutter 30 LFT 5 Remove & Replace Concrete Walk 18 SYD 6 ADA Compliant Ramps 30 SYD 7 Common Excavation 295 CYD 8 #53 Compacted Aggregate Type "O" 12" 400 TON 9 Geogrid Tensar H Series NX850 660 SYD 10 Crosswalk 6" Thermoplastic 50 LFT 11 Stop Bar, Thermoplastic 24 LFT 12 Mobilization 4 - Repp Dr. - State Road 46 to Kiel Way 1 8" Full Depth Reclamation, Cement Slurry 2 Stabilizing Material, Portland Cement 87 TON 3 Corrective Aggregate, FDR 116 TON 4 1.5" Milling 300 SYD 5 Profile Milling 2147 SYD 6 9.5mm HMA Surface (2 x 1.5" Lifts) 600 TON 7 Approach Milling 328 SYD 8 Approach Mix 75 TON 9 2' Stone Shoulder 80 TON 10Transverse Marking, Thermoplastic, Stop Line, White, 24" 24 LFT 11 Mobilization 5 - Marr Road - Gladstone Ave. to State Road 46 1 6" 25mm Patching 616 TON 2 2"Milling 9333 SYD 3 2" 12.5mm HMA Surface 1027 SYD 4 Crack Sealant PG 64 - 22 6 TON 5 Thermoplastic, RR Assembly 4 EA 6 Thermoplastic, 24" Stop Bar 15 LFT 7 Thermoplastic, Lane Lines, 4" Yellow 7000 LFT 8 Thermoplastic, Lane Lines, 4" White 470 LFT 9 Thermoplastic, Arrows 4 EA 10 Mobilization 6 - Gladstone Ave. - 10th St. to 17th St 1 4" Milling 11000 SYD 2 2.5" 19mm Intermediate 1513 TON 3 1 1/2" 9.5 mm Surface 908 TON 4 Remove & Replace 2' Roll Curb & Gutter 1200 LFT 5 Remove & Replace Existing Cross Gutters 97 SYD 6 Adjust Casting to Grade 7 EACH 7 Detector Housings 2 EACH 8 Loop Detectors 8 EACH 9 Line, Thermoplastic, Solid, White, 4in. 7200 LFT 10 Line, Thermoplastic, Dotted, White 4in. 1100 LFT 11 Line, Thermoplastic, Broken, Yellow, 4 in. 1300 LFT 12 Thermoplastic, Only 3 EACH 13 Thermoplastic, Crosswalk 6" 135 LFT 14 Thermoplastic, Stop Bar 70 LFT 15 Thermoplastic, Arrow 7 EACH 16 Thermo, Bicycle Symbol, Torch Down 14 EACH 17 Thermo, Arrow, Torch Down 14 EACH 18 Mobilization 7 - Par 3 Drive - Fairlawn Dr. to Rocky Ford Rd. 1 8" Full Depth Reclamation, Cement Slurry 4016 SYD 2 Stabilizing Material, Portland Cement 162 TON 3 Corrective Aggregate, FDR 216 TON 4 1.5" Milling 300 SYD 5 Profile Milling 4016 SYD 6 9.5mm HMA Surface (2 x 1.5" Lifts) 662.64 TON 7 Approach Milling 75 SYD 8 Approach Mix 11 TON 9 2' Stone Shoulder 120 TON 10 Transverse Marking, Lane Lines, Thermoplastic, Yellow, 4" 3000 LFT 11 Mobilization 8 - Fox Pointe Dr. - 29th St. to Post Horn Ct. 1 6" 25mm Patching 320 TON 2 1.5" Milling 3236 SYD 3 1.5" 12.5mm HMA Surface 80 TON 4 Remove & Replace Concrete Walk 15 SYD 5 Remove & Replace 2' Curb & Gutter 60 LFT 6 ADA Compliant Ramps 9 SYD 7 Crack Sealant PG 64 - 22 0.75 TON 8 Thermoplastic, 24" Stop Bar 30 LFT 9 Mobilization 9 - Silver Fox Drive - Fox Pointe Dr. to Fox Pointe Dr 1 1.25" Milling 3221 SYD 2 6"25mm Base Patching 425 TON 3 1 1/2" 9.5 mm Surface 266 TON 4 Crack Sealant PG 64 - 22 1.5 TON 5 Remove & Replace Concrete Walk 15 SYD 6 ADA Compliant Ramps 4 SYD 7 Remove & Replace Existing Cross Gutters & Aprons 8" Concrete 56 SYD 8 Adjust Casting to Grade 4 EACH 9 Thermoplastic, Crosswalk 6" 110 LFT 10 Thermoplastic, Stop Bar 26 LFT 11 Mobilizatio
Post-Bid
Roads / Highways
$3,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2024
July 29, 2024
Multiple Locations, Columbus, IN
Related To This Project
Columbus, IN
Bid Date: Jun 10 2024
Columbus, IN
--
Columbus, IN
--
Columbus, IN
Bid Date: Sep 04 2024
Columbus, IN
Bid Date: Sep 04 2024
Columbus, IN
Bid Date: Aug 20 2024
Columbus, IN
Bid Date: Sep 24 2024
Columbus, IN
Bid Date: May 28 2024
Columbus, IN
--
Columbus, IN
Bid Date: Jun 03 2024
Columbus, IN
Bid Date: May 30 2024
Columbus, IN
--
Columbus, IN
--
Columbus, IN
Bid Date: May 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.