BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Saint Paul, Minnesota. Completed plans call civil work for a bridge / tunnel, road / highway and water / sewer project.

Term of Contract 1.1 Effective date: Work cannot commence before July 1, 2024, the date the State obtains all required signatures under Minn. Stat. 16C.05, subd. 2, whichever is later. The Contractor must not begin work under this Contract until this Contract is fully executed and the Contractor has been notified by the State to begin the work. 1.2 Expiration date: December 31, 2024, or until all obligations have been satisfactorily fulfilled, whichever occurs first. 1.3 Survival of terms: The following clauses survive the expiration or cancellation of this Contract: Indemnification; State Audits; Government Data Practices and Intellectual Property; Publicity and Endorsement; Governing Law, Jurisdiction, and Venue; and Data Disclosure. Any other Contract term that states it shall survive, shall survive. PREVAILING WAGE REQUIREMENTS. Pursuant to Minnesota Statutes 177.41 to 177.44 and corresponding Minnesota Rules 5200.1000 to 5200.1120, this contract is subject to the prevailing wages as established by the Minnesota Department of Labor and Industry. Specifically, all contractors and subcontractors must pay all laborers and mechanics the established prevailing wages for work performed under the contract. Failure to comply with the aforementioned may result in civil or criminal penalties. Prevailing Wage requirements apply to a contract or work under a contract, under which: 1. only one trade or occupation is required to complete it and the project is greater than $2,500; or 2. the estimated total cost of completing the project is greater than $25,000. The Contractor and Subcontractor shall furnish to the Contracting Authority and the Project Owner all payrolls, of all workers on the project, via E-mail as attachments, to the appropriate E-mail address: prevailingwage.dnr@state.mn.us SCOPE The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary to complete a variety of excavation work including, but not limited to beaver dam removal, culvert installation, crossing removal, culvert cleaning, gravel exploration and minor ditch cleaning in areas located in Northern Beltrami, Roseau, and Western Lake of the Woods Counties. Majority of the excavation work is dispersed across the forest. Exception would be beaver dam removal. Most of the dam removal occurs in the southern portion of the forest on Dick's Parkway, Moose River East, Moose River West, and Rapid River Forest Roads. A power shovel (also known as a track hoe) is required for this solicitation. Estimated excavation of 50-100 hours per year, no guarantee of hours. LOCATION OF WORK The location of the project is: Northern Beltrami, Roseau, and Western Lake of the Woods Counties (see attached maps). The work is to be performed on property owned by the State of Minnesota, Department of Natural Resources. All inquiries, information, and coordination with the Project Supervisor relating to the scheduling of work, use of site and similar matters shall be directed to: Shane Delaney, Project Supervisor Warroad DNR Forestry 16945 State Hwy 89 Wannaska, MN 56761 Telephone: (218) 425-7793 E-mail: shane.delaney@state.mn.us

Award

Bridges / Tunnels

$500,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
802
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, Saint Paul, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.