BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Hay River, Northwest Territories. Design plans call for site work for a power facility; and road / highway.

Fort Providence-Kakisa Transmission Line (FPKTL). This project is for a transmission line to provide hydroelectric power from the existing Taltson hydroelectric system, starting at the junction of Highways 2 and 5, to the communities of Fort Providence and Kakisa, as well as the Dory Point area. Fort Providence to Hay River 72kV and 25kV Interconnection Project (FPKTL Project) is designed to interconnect the communities of Fort Providence, Dory Point, and Kakisa to the existing Taltson transmission grid. The FPKTL project comprises of the following: 1. A new 72kV switching station at Fort Smith highway junction. 2. A new 72kV transmission line from the highway-2/highway-5 junction (point A) to Kakisa junction (point C). The proposed line follows highway-2 in southward direction to Enterprise, then follows highway-1 in the northwest direction to Kakisa junction (total length of 116 km). Between Fort Smith junction (point A) to Pellet Mill (point B), the 72 kV line will also consider 36 km of 25 kV underbuilt line and neutral. 3. A new 72/25 kV substation at Kakisa junction. 4. A new 25kV distribution line from Kakisa junction to Fort Providence (length of 54km). Crossing of the Mackenzie River will be achieved with insulated cables installed in a rack under the Deh Cho bridge. Overhead to cable transition structures (riser structures) will be installed at the intersections of overhead line and the insulated cables. 5. The existing single-phase 7.2kV line between Dory Point and Kakisa junction is to be replaced with a new 25kV line. 6. A new 25/4.16 kV step-down transformer at Fort Providence. 7. A new Dory Point 25/2.4 kV step-down transformer. TIMELINE: Request for proposal from design, construction and post-construction engineering services to provide a full design and act as the project Engineer and Owner's engineer during the construction phase, is closed; preferred proponent is selected. Further update in late fall 2024, upon approvals.

Design

Roads / Highways

$2,000,000.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
1
Bidding Soon
9
All Active Projects
3
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

img_map_placeholder

Multiple Locations, Hay River, NT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.