Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a municipal facility in Odessa, Texas. Completed plans call for the construction of a 500,000-square-foot municipal facility; and for site work for a municipal facility.
Ector County intends to engage a Design Build firm to provide design and construction services for a new courthouse to be located in Odessa, Ector County, Texas. Scope of Work: The design-build team will be tasked with the following: working with all Ector County Departments and Elected Officials to program space requirements for the facility, working with all City of Odessa Departments and Elected Officials to program space requirements for the facility, Attending all regular meetings with Ector County staff on progress of design, Attending community town-hall events to receive input from the public in the lead up to the November 2025 Election, Producing 3-dimensional imagery of the proposed facility from both external and internal perspectives at the time of the Guaranteed Maximum Price; and Complete a full schematic drawing, full design-development program, construction documents including Issue for Construction. Square Footage: The courthouse plan should fit in the range of 240,000 square feet to 500,000 square feet depending on cooperation with the City of Odessa. Budget: Ector County's Budget for this project is between $100 million and $300 million. Location: The location for this build is 200 N Texas Avenue, Odessa, Tx 79765. The current location is 3.5813 acres with a legal description found online. Ector County proposes utilizing the Design Build procurement process set for in Sec. 2269.301 - .311 of the Texas Local Government Code. The estimated budget for construction which includes all contractor fees and construction contingencies is between $120M - $350M depending upon the use of the project which shall be determined in the future by the County. Construction is scheduled to be performed as soon as funding is obtained, plans are completed and permits are received. Ector County reserves the right to accept or reject any or all responses, to waive all informalities and irregularities and to make a selection in the best interest of the County. The information contained in this document does not, and is not intended to, constitute legal advice; instead, all information, content, and materials contained in this document are for general informational purposes only. The information herein may not constitute the most up-to-date legal or other information. No reader, or user of this document should act or refrain from acting on the basis of information in this document without first seeking legal advice from counsel in the relevant jurisdiction. All liability with respect to actions taken or not taken based on the contents of this document are hereby expressly disclaimed. Questions Due: June 4, 2024, 5:00pm Questions Answered: June 7, 2024, 5:00pm. Any interpretation, corrections or changes to these specifications will be made by addenda. Sole issuing authority of addenda shall be vested in the Ector County Purchasing Department. Addenda will issued through electronically. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimate is between $120M - $350M
Award
Municipal
$300,000,000.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2024
February 20, 2025
300 N Grant Ave, Odessa, TX
Related To This Project
Odessa, TX
--
Odessa, TX
--
Odessa, TX
Bid Date: May 29 2024
Odessa, TX
--
Odessa, TX
Bid Date: Jun 11 2024
Odessa, TX
--
Odessa, TX
--
Odessa, TX
Bid Date: Jul 17 2024
Odessa, TX
Bid Date: Jun 06 2024
Odessa, TX
--
Odessa, TX
Bid Date: Jun 11 2024
Odessa, TX
Bid Date: May 28 2024
Odessa, TX
Bid Date: Jun 06 2024
Odessa, TX
Bid Date: May 15 2024
Odessa, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.