Site work and paving for a mixed-use development in Hollister, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Reference Number 0000352534 This project includes various types of improvements throughout the City of Hollister. This project has been organized by seven (7) different sub-projects based upon the type of proposed improvements and location of improvements within the City of Hollister. These 7 different sub-projects encompass this overall 2024 CIP Project. Pavement rehabilitation treatments and general improvements to be implemented and installed include base failure repair, cold plane and HMA overlay, slurry seal, signing and striping improvements, concrete curb, curb ramps, sidewalk, drainage improvements, radar speed feedback signs, and rectangular rapid flashing beacons. General Requirements - Certified Payroll - Contractors License Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % Question Deadline 06/06/2024 at 5:00 PM PT Questions are submitted online Yes Contract Time. Contractor shall diligently prosecute the Work to Substantial Completion within One hundred and Twenty (120) working days after the date specified in City's Notice to Proceed (the Contract Time of Completion). PROJECT DESCRIPTION This project is subject to a Community Workforce Agreement/Project Labor Agreement. A copy of this agreement titled "Community Workforce Agreement for the City of Hollister" is available at the website This project includes various types of improvements throughout the City of Hollister. This project has been organized by seven (7) different sub-projects based upon the type of proposed improvements and location of improvements within the City of Hollister. These 7 different subprojects encompass this overall 2024 CIP Project. A brief description of each sub-project is provided below. o 2024 Pavement Rehabilitation o This project includes pavement rehabilitation treatments and general improvements to be implemented and constructed including base failure repair, cold plane and HMA overlay, striping, concrete curb, curb ramps, sidewalk, and minor drainage improvements, throughout various streets in the City of Hollister as noted on the project plans. o 2024 City Wide Slurry Seal Project o This project includes slurry seal treatment and striping improvements throughout various streets in the City of Hollister as noted on the project plans. o Ladd Lane & Southside Road Improvement Project o This project includes slurry seal treatment, signing & striping improvements, removal of existing traffic circles, and the installation of radar speed feedback signs along Ladd Lane (from Tres Pinos Rd to Southside Rd) and Southside Rd (from Ladd Lane to San Benito St) o McCray St Driveways o This project includes the reconstruction of two existing driveways, at 1115 McCray St and 1101 McCray St, to provide an ADA compliant path of travel and minor drainage and striping improvements. o Wentz, Browns & Swope Alleys Reconstruction Project o This project includes the reconstruction of three Alleys, including full pavement reconstruction, driveway reconstruction, and significant drainage infrastructure improvements. This project includes improvements along Wentz Alley (from Wentz Alley to Monterey St), Browns Alley (from West St to Monterey St) and Swope Alley (from West St to Monterey St), and improvements along West St (from Browns Alley to Swope Alley). o Santa Ana Rd Re-Striping Project o This project includes signing, striping, and slurry seal improvements of Santa Ana Road approximately between the intersections of Santa Ana Road/La Baig Drive and Santa Ana Road/Memorial Drive. o Memorial Dr Crossing Project o This project includes signing, striping, and slurry seal improvements of Memorial Drive approximately between the intersections of Memorial Drive/Hillcrest Road and Memorial Drive/Sunnyslope Road. Additionally, there are is sidewalk and curb ramp improvements, median island improvements, minor drainage improvements, and solar-powered rectangular rapid flashing beacon installations at three locations within these project limits. Traffic signal modifications at the intersection of Memorial Drive/Sunnyslope Road include recutting and installation of detector loops to accommodate a bicycle box
Bid Results
Roads / Highways
$8,278,107.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2024
August 13, 2024
Multiple Locations, Hollister, CA
Related To This Project
Hollister, CA
--
Hollister, CA
--
Hollister, CA
--
Hollister, CA
--
Hollister, CA
Bid Date: Aug 06 2024
Hollister, CA
Bid Date: Aug 28 2024
Hollister, CA
Bid Date: Sep 06 2024
Hollister, CA
Bid Date: Nov 14 2024
Hollister, CA
Bid Date: Jun 03 2024
Hollister, CA
--
Hollister, CA
--
Hollister, CA
Bid Date: May 31 2024
Hollister, CA
Bid Date: Mar 29 2024
Hollister, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.