BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2025 at 8:00 PM

Updated June 28, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Sauk Centre, Minnesota. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of June 27, 2025, per owner, the letting is scheduled for October 22, 2025, so no contractor has been selected at this point. Design team identified and they anticipate tree clearing to start sometime in January 2026. They have a tentative schedule for the bridge work, but that will be dependent upon the contractor. MnDOT needs professional and technical assistance for the development of final layout, construction limits, highway design plans, special provisions, wetland delineations and aquatic recourses for National Environmental Policy Act (NEPA) documents for State Project (SP) 7380-260 (I94). The project is located east of the city of Sauk Centre and west of the city of Melrose and is a bridge replacement and bridge overlay project. Bridge # 73805 and 73809 will be replaced and their sister bridges # 6896 and 6897 will be overlayed. The project will include replacing two bridges overlaying their sister bridges, replacement of guardrail, approach panels, and crossovers to facilitate traffic. To facilitate traffic crossovers will be constructed on each end of the set of bridges on I94. Project Goal The goal of this project is to develop a final layout, biddable final plan set and special provisions for SP 7380-260, I94. Construction support will also be required for any design questions during the construction of the project. Prospective, pre-qualified responders who have any questions regarding this request for letters of interest must submit questions, by e-mail, to the Contract Administrator: Jason Alcott, Contract Administrator jason.alcott@state.mn.us Questions regarding this announcement must be received, via e-mail, by the Contact Administrator identified above no later than 2:00PM Central Daylight Time on 5/28/2024. MnDOT anticipates posting answers to all questions received by 2:00PM Central Daylight Time on 5/29/2024. MNDOT: RFP Engineering - Roadway Design and Preparation of a Final Plan-Set for the Bridge Replacement and Bridge Overlay Project on TH 94

Design

Bridges / Tunnels

$4,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
23
Bidding Soon
590
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

Project location map

I-94, Sauk Centre, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.