BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Princeton, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Pavement Replacement2100168 Gibson County - on Sr 64 From 1.01 Mi E of Us 41 to 2.88 Mi E of Us 41 Slide Correction2100263 Gibson County - Along Sr 64 From 2.0 Miles W of I-69 to 2.3 Miles W of I-69 2301285 Traffic Signals Modernization2301285 Gibson County - on Sr 64 From 1.01 Miles E of Us 41 to 2.88 Miles E of Us 41 2400692 Ada Sidewalk Ramp Construction2400692 Gibson County - Along Sr 64 From 1.01 Mi E of Us 41 to 2.88 Mi E of Us 41 2600058 Ada Princeton Sidewalk Construction2600058 Gibson County - Along Sr 64 From 1.01 Mi E of Us 41 to 2.88 Mi E of Us 41 2600058, 8915400, STP-018-2(004), 1298676, R-35927, 2100168 The Indiana Department of Transportation (INDOT) intends to resolve an existing slide occurring along SR 64 by relocating the existing waterways in Gibson County, Indiana, approximately 2.3 miles west of I-69. More specifically, the project is located in Section 20, Township 2 South, Range 9 West (Contract No. R-43995). The proposed project will relocate Lost Creek and Unnamed Tributary (UNT) 1 and 2 to Lost Creek from the westbound foreslope to the north away from the toe of slope of the roadway. Revetment riprap will be installed at each stream: Lost Creek, UNT 1 & 2 to Lost Creek. The proposed channel relocation will stretch from CV 064-026-19.38 in the east to CV 064-026-19.15 in the west. There are no planned activities involving the culverts. Tree clearing will be necessary as part of the project. A maximum of 1.6 acres of tree clearing may occur within the project limits. Construction is anticipated to begin in Spring 2026 An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Bid Express does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 220 - Pavement Replacement - SR 64

Award

Roads / Highways

$15,299,903.00

Public - State/Provincial

Paving, Site Work

685

11

9

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
56
Bidding Soon
844
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2026

March 1, 2027

Project location map

IN-64, Princeton, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.