BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Ardrossan, Alberta. Completed plans call for site work for a bridge / tunnel.

Parks Canada requires the replacement two (2) culverts within Elk Island National Park (EINP). Further description/information on each location is outlined below: A) Hayburger Culvert: The existing Hayburger Culvert is a galvanized, rigid steel pipe, approximately 21.0m in length, 0.5m in diameter (which is known to be undersized) and located at 533753 N, 1125128 W. This culvert requires full replacement as it is completely blocked and suspected to be collapsed. The Hayburger Culvert is located along the Elk Island Parkway and access across this crossing may need to be maintained throughout construction. It may be possible to close the Parkway at this location, depending on expected duration of construction/closure as well as potential impacts to operations, so long as the appropriate notifications and communications are conducted. B) Beaver Pond Culvert: The existing Beaver Pond Culvert is a galvanized, rigid steel pipe, approximately 15.8m in length, 0.81m in diameter (which is known to be undersized) and located at 534120 N, 1124840 W. This culvert requires full replacement. The Beaver Pond Culvert is located along the Elk Island Parkway and access across this crossing may need to be maintained throughout construction. It may be possible to close the Parkway at this location, depending on expected duration of construction/closure as well as potential impacts to operations, so long as the appropriate notifications and communications are conducted. All work will be documented and outlined in a separate tender and construction package which will be provided in Stage 2. To assist with bonding and insurance requirements, this project is estimated at a value between $250,001 > $ 500,000, Taxes extra. Contractor cannot begin the Work prior to September 3rd, 2024, and must perform and complete the Work no later than October 4th, 2024. The Crown retains the right to negotiate with suppliers on any procurement. This is a two stage selection process. Bidders responding to this selection process are requested to submit a bid in two stages. This posting is the first stage (Stage One) of a two-stage solicitation process: the first stage will evaluate the qualifications of all interested suppliers; the second stage (Stage Two) will invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. Upon award of contract in Stage Two the pre-qualification list will expire and will not be used in any other solicitation. The qualification list will expire within 180 days or upon award of a contract in Stage Two, whichever is earlier, and the prequalification list will not be used in any other solicitation.

Post-Bid

Bridges / Tunnels

$500,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
32
Bidding Soon
543
All Active Projects
186
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 27, 2024

September 3, 2024

October 4, 2024

img_map_placeholder

54401 Range Rd 203, Ardrossan, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.