BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Oklahoma City, Oklahoma. Completed plans call for site work for a water / sewer project.

Tinker Server Mains and Lilt Station Elimination, East Area, Phase I. Question Deadline 05/21/2024 at 10:00 AM CT All questions must be submitted through Periscope by Answers to the questions will be posted in Periscope by 10:00 a.m. on May 29, 2024. Contract terms are not negotiable. The City may negotiate Scope of Work, Compensation, and Additional Services. If the City or Trust determines, in its sole discretion, the City or Trust is not able to timely negotiate an acceptable Scope of Work, Compensation, and Additional Services with the selected Consultant, then the City or Trust may terminate such negotiations and commence negotiation with another Consultant. Timeline: An approvable engineering report will be required within 200 days from the issuance of the notice to proceed. An amendment may be issued for plans and specifications after OCWUT receives the engineering report. Scope of Work: Provide a study and engineering report for the phasing of eliminating sewer lift stations in the East Area of Tinker Air Force Base (TAFB). 'Hie Oklahoma Water Utilities Trust (OCWUT) owns and operates the wastewater system on TAFB. excluding the privatized Family Housing area. The wastewater system consists of approximately 25 miles of sewer mains. 470 manholes, and 57 lift stations. Most of the sewer mains on TAFB have diameters less than 15 inches and are vitrified clay pipes. The East Area, as shown in Attachment B. consists of approximately 7 miles of sewer main that is conveyed north to a 22-inch ductile iron sanitary sewer interceptor that crosses the flight line. The 22-inch sanitary sewer convey flows from the east side of the base to the 36-inch interceptor on the west side of the base. There are approximately 11 lift stations in the East area. A Lift Station Elimination Plan was developed in 2021 that determined the feasibility of eliminating lift stations. It was determined that approximately 8 lift stations could be eliminated from the East Area of TAFB utilizing approximately 2 miles of new sanitary sewer main. The fixed Limit of Construction Cost is $7,600,000. The City and its Trust reserve the right to award the Contract(s) or not and to revise the Scope of Services and/or the Project scope or description, as may be in the best interest ofthe City or Trust.

Under Construction

Water / Sewer

$7,600,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
55
Bidding Soon
431
All Active Projects
192
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

July 4, 2024

img_map_placeholder

To Be Determined, Oklahoma City, OK

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.