Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a fitness / recreation center in Hayward, California. Working plans call for the renovation of a fitness / recreation center.
**As of June 13, 2024 bids received were rejected. No definite date for the rebid.** The Work may consist of the following: contractor to provide repairs and painting at the HARD District Officesas described in documents herein, including but not limited to exterior siding and trim patching and painting.It is expected that the north side of the building will be painted by HARD staff. Contractor is asked to provide two prices: Price 1 Trim only - East, West and South Faces, including all railing, louvers, doors, wall mounted ductwork, flashing and vertical concrete (no stucco). Price 2 Trim and Exterior wall surfaces on East, West and South Faces, including all railing, louvers, doors, wall mounted ductwork, flashing and vertical concrete and stucco surfaces. No bid may be withdrawn for a period of sixty (60) days after the date set for the opening for bids except asprovided pursuant to Public Contract Code Sections 5100 et seq. As security for its Bid, each bidder shall provide with its Bid form a bid bond issued by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the Hayward Area Recreation and Park District, in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. Construction Duration: Sixty (60) consecutive calendar days. Notice of Award 6/18/2024 Notice to Proceed - Estimated 7/04/2024 To bid on this Project, the Bidder is required to possess one or more of the following State of California Contractor Licenses: B (General Building), C-33 (Painting Contractor) Question Deadline 05/23/2024. All inquiries and questions should be emailed to: Project Manager Contact: Diane Hardy Email: hard@haywardrec.org Phone: 510-453-9970 The District's Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdrawits bid for ninety (90) days after the date of the bid opening. If electronic package is larger than maximum size, Bidder is responsible to deliver a download link before deadline, wherein required submittal materials can be successfully downloaded. Bidder is responsible for the successful download of all material.
Final Planning
Fitness / Rec Centers
$20,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2024
December 13, 2024
1099 E St, Hayward, CA
Related To This Project
Hayward, CA
Bid Date: Jun 20 2024
Hayward, CA
Bid Date: Jun 11 2024
Hayward, CA
Bid Date: Oct 30 2024
Hayward, CA
Bid Date: Apr 27 2021
Hayward, CA
--
Hayward, CA
Bid Date: May 30 2024
Hayward, CA
Bid Date: May 23 2024
Hayward, CA
--
Hayward, CA
--
Hayward, CA
Bid Date: Jun 13 2024
Hayward, CA
Bid Date: May 21 2024
Hayward, CA
Bid Date: May 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.