BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in West Wardsboro, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project entails grinding the existing road surface and applying virgin asphalt to enhance safety, functionality, and aesthetics for residents and visitors. The goal is to provide a durable, smooth roadway that improves travel conditions along Cross Road. Project Scope: 1. Road Grinding: The selected contractor shall conduct milling or grinding of the current road surface (approx. 0.22 Miles) to full depth, ensuring the removal of deteriorated asphalt and preparing a smooth base for the new pavement. 2. Paving with Virgin Asphalt: The contractor shall pave 2.5” (type 2 base) and 1.5” Top (type 4 asphalt) and will not use any recycled asphalt products 3. Shouldering the road: The contractor will apply shoulder material 1’ wide by 4” deep, both sides for the road for .22 miles total length. 4. Surface Preparation: Prior to asphalt application, the contractor shall perform necessary surface preparation activities, including grading and compacting to ensure optimal and performance. 5. Quality Assurance: The contractor is responsible for adhering to industry best practices and quality standards throughout all project phases, including material selection, mixing, and application. 6. Traffic Control: The contractor shall implement appropriate traffic control measures to minimize disruptions to residents, businesses, and motorists during construction. This may include temporary road closures, detours, and signage as needed. 7. Project Timeline: The proposal should include a proposed timeline outlining key project milestonThis project entails grinding the existing road surface and applying virgin asphalt to enhance safety, functionality, and aesthetics for residents and visitors. The goal is to provide a durable, smooth roadway that improves travel conditions along Cross Road. Project Scope: 1. Road Grinding: The selected contractor shall conduct milling or grinding of the current road surface (approx. 0.22 Miles) to full depth, ensuring the removal of deteriorated asphalt and preparing a smooth base for the new pavement. 2. Paving with Virgin Asphalt: The contractor shall pave 2.5" (type 2 base) and 1.5" Top (type 4 asphalt) and will not use any recycled asphalt products 3. Shouldering the road: The contractor will apply shoulder material 1' wide by 4" deep, both sides for the road for .22 miles total length. 4. Surface Preparation: Prior to asphalt application, the contractor shall perform necessary surface preparation activities, including grading and compacting to ensure optimal and performance. 5. Quality Assurance: The contractor is responsible for adhering to industry best practices and quality standards throughout all project phases, including material selection, mixing, and application. 6. Traffic Control: The contractor shall implement appropriate traffic control measures to minimize disruptions to residents, businesses, and motorists during construction. This may include temporary road closures, detours, and signage as needed. 7. Project Timeline: The proposal should include a proposed timeline outlining key project milestones, start date, completion date, and any other relevant scheduling information. 8. Environmental Compliance: The contractor shall comply with all relevant environmental regulations and guidelines, including proper disposal of waste materials and protection of surrounding natural resources. 9. Communication and Coordination: The contractor shall maintain open communication with the Town of Wardsboro throughout the project and provide regular updates on progress, issues, and any deviations from the proposed plan. Proposal Submission Requirements: 1. Project Approach: Detail the proposed approach, methodology, and techniques for completing the paving project, including any innovative or unique strategies. 2. Cost Proposal: Submit a detailed cost proposal, including itemized estimates for materials, labor, equipment, and any additional expenses associated with the project. 3. Insurance and Bonding: Provide proof of insurance coverage and bonding as required by the Town of Wardsboro. For inquiries and proposal submissions, please contact: Jake Garland Highway Foreman 802-896-6542 Wardsborohighway@myfairpoint.net The Town of Wardsboro reserves the right to reject any or all proposals and to waive any informalities or irregularities in the proposals received.es, start date, completion date, and any other relevant scheduling information. 8. Environmental Compliance: The contractor shall comply with all relevant environmental regulations and guidelines, including proper disposal of waste materials and protection of surrounding natural resources. 9. Communication and Coordination: The contractor shall maintain open communication with the Town of Wardsboro throughout the project and provide regular updates on progress, issues, and any deviations from the proposed plan. Proposal Submission Requirements: 1. Project Approach: Detail the proposed approach, methodology, and techniques for completing the paving project, including any innovative or unique strategies. 2. Cost Proposal: Submit a detailed cost proposal, including itemized estimates for materials, labor, equipment, and any additional expenses associated with the project. 3. Insurance and Bonding: Provide proof of insurance coverage and bonding as required by the Town of Wardsboro. For inquiries and proposal submissions, please contact: Jake Garland Highway Foreman 802-896-6542 Wardsborohighway@myfairpoint.net The Town of Wardsboro reserves the right to reject any or all proposals and to waive any informalities or irregularities in the proposals received.

Post-Bid

Roads / Highways

$250,000.00

Public - City

Paving, Site Work

7

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
96
Bidding Soon
1,443
All Active Projects
654
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

July 4, 2024

img_map_placeholder

Cross Rd, West Wardsboro, VT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.