BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2024 at 7:00 PM

Updated December 7, 2024

Site work and paving for a civil project in Oak Creek, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The work, officially known as Project No. 24115, SHEPARD AVENUE WATER MAIN RELAY PROJECT, consists of constructing the following approximate quantities: 1,380 LF of 12" dia. PVC water main relay, 47 LF 6" Dia. PVC Hydrant Lead, 61 LF of 4" dia. PVC water service relay, 476 LF 1.25" Dia. HDPE Water Service, 2 Each Remove and Relocate Hydrant, 2 Each 12" Gate Valve & Box, 2 Each 6" Gate Valve & Box, 1 Each 4" Gate Valve & Box, 12 Each 1.25" Corporation Stop; 12 Each 1.25" Curb Stop & Box, Pavement Restoration; Pavement Marking Restoration, Turf Restoration, Erosion Control, and Traffic Control. BID GUARANTEE A certified check or bank draft payable to the Oak Creek Water & Sewer Utility, or a satisfactory bid bond, in an amount not less than 5% of the bid shall accompany each bid as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract and bond within 10 days after the award of the contract. In case the bidder fails to file such contract and bond within the time set by the Utility, the check or bid bond shall be forfeited to the Utility as liquidated damages. The Oak Creek Board of Public Works and Capital Assets reserves the right to reject any and all bids, waive any informalities in bidding, or to accept the bid or bids, which best serves the interest of the Utility.

Award

Roads / Highways

$527,697.00

Public - City

Paving, Site Work

12

10

4

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
416
Active Projects
193
Bidding Soon
2,811
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2024

March 31, 2025

Project location map

S Shepard Ave, Oak Creek, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.