BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Apache Junction, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Tracs No 0000 PN APJ T0375 01C Project No APJ-0(221)T Termini City of Apache Junction Location Ironwood Drive, Baseline Ave to Elliot Rd Route No. N/A Milepost N/A District Central Item No.Local The amount programmed for this contract is $ 1,735,600. The location and description of the proposed work are as follows: The proposed project is located in the City of Apache Junction on Ironwood Drive from Baseline Avenue to Elliot Road within the Pinal County. The work includes widening the outside shoulder and installing edge line rumble strips for 2 miles of Ironwood Drive between Baseline Avenue to Elliot Road. The work also include pavement marking and other related work. The time allowed for the completion of the work included in this contract will be 105 calendar days. Question Deadline 07/09/2024 Any questions received less than three working days prior to the bid opening date may not be answered. Prior to the bid opening date, any questions pertaining to the plans, specifications, and bid schedule for this project shall be submitted to the Department in a written format through the Online. Questions can be submitted through the Questions and Answers link located within the corresponding letting date and project proposal number links. Engineering Specialist: Mahdi Ghalib Pre-Qualification: Yes A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Surety (bid) bonds will be accepted only on the form provided by the Department and only from corporate sureties authorized to do business in Arizona. AZDOT - System Enhancement (Safety Improvements) - Ironwood Drive Addendum #1 has been issued as of 7-10-2024.

Award

Roads / Highways

$1,351,111.00

Public - State/Provincial

Paving, Site Work

31

5

2

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
42
Bidding Soon
1,002
All Active Projects
443
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 12, 2024

September 10, 2024

img_map_placeholder

Ironwood Dr, Apache Junction, AZ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.