BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Ayden, North Carolina. Completed plans call for site work for a water / sewer project.

2" WATER SERVICE to be installed on new water lines under this contract to include, but not limited to: 2" service saddle and tap, 2" corporation stop, 2" GATE VALVE (single disc iron body), cast iron valve box and cover (Type B), 2" PVC, ASTM D2241, SDR 21, NSFPW service pipe, 2" curb stop, keyed bullet-type lock, 2" water meter, meter tailpieces, 2" double check valve, 2" PVC extension pipe and cap, gaskets, meter boxes, brass nipples, excavation, bedding, installation, backfill, compaction, testing, disinfection, entire service complete, fully operational, and ready for customer use. UNIT PRICES shall include all CONTRACTOR'S responsibilities as outlined and identified more specifically within the PLANS and/or called for in the SPECIFICATIONS to include but not limited to: clearing and grubbing; demolition; disposal; dewatering; trench excavation; bore pit excavation; excavation; shoring, sheeting and bracing; materials; special fittings; gaskets; transition gaskets; pipe centering supports in casings; respective bedding, haunching, and initial backfill material; bedding, haunching, and initial backfill; foundations; concrete thrust blocking; thrust rodding; gripping rings; uncased drybores; polyethylene encasement; electromagnetic detectable marking tape; electromagnetic detectable location wire; undercut; borrow; backfill; compaction; subgrade preparation; tie-ins to existing system; filling; flushing; testing; chlorination; disinfection; grading; fine grading; topsoil; proofrolling; seeding; incidental stone base; traffic regulation; erosion and sedimentation control devices and methods; rip rap; repair and/or replacement of all existing underground utilities or facilities encountered; holding, temporary relocation, or permanent relocation of existing utilities as necessary to install proposed utilities; removal and disposal of all debris; waterline abandonment; startup; cleanup; all appurtenances; total job complete and fully operational.

Bid Results

Water / Sewer

$339,920.00

Public - City

Site Work

15

13

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
79
Bidding Soon
1,057
All Active Projects
460
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.