Site work for a water / sewer project in Brockton, Massachusetts. Completed plans call for site work for a water / sewer project.

The work consists of trenchless rehabilitation and open-cut spot repairs of existing sewers and rehabilitation of existing sewer manholes of the Brockton sewer system within sub-areas 17, 19, 48, and 55. The work includes light and heavy cleaning of sewers, television inspection, open-cut spot repairs, chemical root control and cured-in-place (CIP) sewer pipe lining, and rehabilitation of sewer manholes. Cured-in-place pipe lining will include television inspection and testing and sealing of the first two joints of each service connection. The work also includes, but is not limited to, all restoration, bypass pumping, and miscellaneous work and cleanup. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Estimated Cost $1,900,000 Preparatory cleaning and internal television inspection, and installation of curedin-place liner with follow-up testing and sealing of service connections for approximately 34,500 linear feet of existing 6- to 12-inch sewer mains as identified in Table A. b. Grinding of protruding tapped sewer services prior to installation of cured-in-place liner. c. Chemical root control removal for approximately 6,400 linear feet of existing 6- to 8-inch sewer mains as identified in Table B. d. Rehabilitation of approximately 130 sewer manholes as identified in Table C. e. Perform cleaning and internal television inspection for additional existing 6- to 12- inch sewer mains as identified in Table D. f. Performing heavy cleaning and internal television inspection of existing 6- to 12- inch diameter sewer mains, as needed. g. Open-cut spot repairs of mainline sewers identified by Contractor during preparatory cleaning and television inspection work. h. Open-cut replacement of sewer service from mainline to property line identified by Contractor during preparation cleaning and television inspection work. i. Note it is the Owner's intention to complete required open-cut spot repairs with Brockton Sewer Department crews, but Contractor may be required to complete spot repairs, as directed by the Engineer and Owner. j. Maintain existing sewer flow (bypass pumping) during the work, including all cured-in-place pipe lining, as needed and as described in Section 015728 "Temporary Bypass Pumping Systems." k. Traffic management. l. All other incidental work to complete the project as specified herein and as shown on the Drawings. PROJECT NO. DPW BID24-SEWER All questions about the meaning or intent of the Contract Documents shall be received in writing by CDM Smith, 3 Davol Square, Building A, Suite A-425, Providence, Rhode Island, Attn: Chad Kershaw, kershawcj@cdmsmith.com, at least ten days before the date set herein for the opening of bids. Bidders are responsible for verifying that their question(s) are received. 4.2 Written clarifications or interpretations will be issued by Addenda not later than five days before the bid opening date. Only questions answered by formal written Addenda will be binding. Oral and other clarifications or interpretations will be without legal effec

Award

Water / Sewer

$1,489,950.00

Public - City

Site Work

18

13

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
150
Bidding Soon
2,557
All Active Projects
1,086
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2024

July 22, 2024

img_map_placeholder

Multiple Locations, Brockton, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.