BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bloomington, Indiana. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Title: City of Bloomington, Indiana Construction Engineering for the West 2nd Street Modernization and Safety Improvement Project from South Walker Street to the B Line Trail (Des # 2200012) in the Seymour District. This Request for Proposals (R.FP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perfonn any services but only serves notice the firm desires to be considered. Local Public Agency: City of Bloomington, Indiana Project Location: West 2nd Street from South Walker Street to the B Line Trail, Bloomington, Indiana Project Description: This project consists of the reconstruction of West 2nd Street. A two-way protected bike lane will be constructed on the north side of West 2nd Street .Additionally, two existing traffic signals will be replaced and modernized. New storm sewer, drainage improvements, accessible sidewalks, curb ramps, and bus stops will also be provided along the full length of the project corridor. INDOT Des #: 2200012 Phases Included: CE Estimated Construction Amount: $7,046,787.00 Funding: Federal funding with local match Term of Contract: Until Project Completion DBE goal: 7% Contact for Questions: Kendall Knoke / Project Engineer 401 North Morton Street Bloomington, IN 47404 812-349-3467 kendall.knoke@bloomington.in.gov The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Indiana Construction Engineering for the West 2nd Street Modernization and Safety Improvement

Conceptual

Roads / Highways

$7,046,787.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
68
Bidding Soon
883
All Active Projects
430
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2025

img_map_placeholder

W 2nd St, Bloomington, IN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.