Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a mixed-use development in Lawrence Township, New Jersey. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.
CR583 (Princeton Pike), Bridge over Route 295 & Ramps B & D, Contract No. 004183640, Superstructure Replacement, Lawrence Township, Mercer County; Federal Project No: 0583302, UPC No: 183640, PE No: 1138509, CE No: 1138511 Estimated Completion Date on August 13, 2027 Project Labor Agreement Required: No Estimated Range between $20,000,001 to $35,000,000 Contractors Prequalified in one of these Work Types are eligible to bid this project: 4, 4I or 5 The Principal Items of Work Consist of: Roadway Quantity Unit Description 5,925 T Hot Mix Asphalt 12.5 M 64 Surface Course 3,444 Lf Electrical Conduit Bridge: Quantity Unit Description 252,888 Lb Reinforcement Steel, Epoxy-coated 784 Cy Concrete Bridge Deck, Hpc 714 Lf Concrete Bridge Parapet, Hpc 326 Cy Concrete Bridge Approach Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d). Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on File With This Department. The Attention of Bidders is Directed to the Provisions Covering Subletting or Assigning The Contract to Section 108-prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The Entire Work is to Be Completed on or Before the Estimated Completion Date Stated Above. DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33. NJDOT: 119 - Superstructure Replacement - CR 583 (Princeton Pike), Bridge Over Rt 295 and Ramps B and D *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$19,695,582.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2024
August 5, 2024
Princeton Pike, Lawrence Township, NJ
Related To This Project
Lawrence Township, NJ
Bid Date: Jul 30 2024
Lawrence Township, NJ
Bid Date: Jun 26 2024
Lawrence Township, NJ
Bid Date: Jul 24 2024
Lawrence Township, NJ
Bid Date: Sep 04 2024
Lawrence Township, NJ
Bid Date: Sep 24 2024
Lawrence Township, NJ
Bid Date: Aug 27 2024
Lawrence Township, NJ
Bid Date: Sep 11 2024
Lawrence Township, NJ
Bid Date: May 29 2024
Lawrence Township, NJ
Bid Date: Jun 05 2024
Lawrence Township, NJ
Bid Date: Jun 05 2024
Lawrence Township, NJ
Bid Date: May 29 2024
Lawrence Township, NJ
Bid Date: Aug 09 2024
Lawrence Township, NJ
Bid Date: Apr 26 2024
Lawrence Township, NJ
Bid Date: Apr 04 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.