BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2025 at 7:00 PM

Updated January 8, 2025

Site work and paving for a sidewalk / parking lot in Gilbert, Arizona. Working plans call for site work for a 6,000-square-foot sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The owner has determined a prequalified list of construction managers. This will be a Construction Manager at Risk Project pursuant to ARS Section 34- 601 et seq PR0710 Riparian Education Center - Design and construction to develop a Riparian Education Center on the grounds at a Riparian Area. Center will house educational displays, classrooms, office space, Town Store, exhibit space and restrooms. Center will be approximately 6,000 square feet. PR1110 SERL Parking Lot Connection - Connect the parking lots on the north and west sides of the Southeast Regional Library (SERL) to allow vehicles to circulate without exiting the site and providingadditional parking spaces. Project elements also will include the removal of the existing non-functioning water feature at the northwest corner of the library, addition of dedicated right turn lanes into the site on Greenfield and Guadalupe, resurfacing the existing parking lots, and addressing drainage issues on the site.

Final Planning

Sidewalks / Parking Lot

$520,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
45
Bidding Soon
1,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2024

January 29, 2025

Project location map

Multiple Locations, Gilbert, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.