Site work and paving for a road / highway in Saint Paul, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Grading, Bituminous Surfacing and Guardrail Direct questions about this Project, including pre-bid questions, to Alison Berreth at 651-775-1129 and alison.berreth@state.mn.us. Workforce participation goals are applied on a county-by-county basis. For Projects spanning more than one county, the workforce participation goals of the assigned county apply. For statewide Projects, the highest workforce participation goals of any county located within the covered work area apply. The workforce participation goals for this Project are: Minority: 22% Women: 15% DESCRIPTION This Work consists of furnishing, installing, maintaining, and removing all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvements in a condition that accommodates public traffic. Do not close roads or pedestrian facilities, except as authorized. The Engineer may modify the requirements for traffic control as deemed necessary. The Department will maintain Detour Roads established by the Commissioner for through traffic diverted from the Project unless otherwise indicated in the Plan. The use of maintenance crossovers in or near the construction area is permitted if authorized by the Engineer. The Contractor is not responsible for snow removal from roads or pedestrian facilities open to public traffic. Do not suspend operations for the winter until meeting the requirements of 1803.4, "Temporary Suspensions". During authorized winter suspension, the Department will maintain traffic control devices. If traffic control devices are damaged or destroyed, the Department will pay the Contractor the value of the device as determined by the Engineer. All temporary traffic management must conform to and be installed in accordance with: o the "Minnesota Manual on Uniform Traffic Control Devices" (MN MUTCD); o the "Minnesota Temporary Traffic Control Field Manual" (Field Manual); o the "Speed Limits in Work Zones Guidelines"; o the "Minnesota Flagging Handbook"; o the "MnDOT Standard Signs and Markings Manual"; o the Plan; o all applicable standard Specifications and Special Provisions Contract Time A The Contractor must not perform Work that will restrict or interfere with traffic between 12:00 noon on the day before and 9:00 A.M. on the day after any consecutive combination of a Saturday, Sunday, and Holiday. The Contractor may request exceptions to this requirement. Exceptions must be approved in writing by the Engineer. B The Contractor must start construction operations on July 22, 2024, or no later than eight Calendar days after the date of Notice Contract Approval, whichever is later. The Contractor must not begin construction operations before Contract approval. C The Contractor must complete all Work required under the Contract, except turf establishment requirements before September 21, 2024. D The Contractor must complete all Work to meet the requirements of 1516.2, "Project Acceptance," under this Contract before June 7, 2025.

Post-Bid

Roads / Highways

$50,000.00

Public - State/Provincial

Paving, Site Work

92

7

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
81
Bidding Soon
779
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

July 22, 2024

img_map_placeholder

Multiple Locations, Saint Paul, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.