Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Worthington, Minnesota. Contact the soliciting agency for additional information.
The system's overarching goal for campus comprehensive facilities planning is to provide the campus with a framework to align its financial, physical, and academic resources to deliver the best higher education to its students. The colleges and universities of Minnesota State use their current Comprehensive Facilities Plans when: o Developing projects for a capital budget or revenue bond request o Evaluating and improving space utilization o Acquiring or selling real estate o Prioritizing repair and replacement needs, and o Identifying or removing obsolete space. The utility master planning process develops a road map to ensure that utility systems can reliably and efficiently serve the campus's current and future service needs. The process includes evaluating existing utility system conditions, understanding future service needs, evaluating options for meeting these future needs, and articulating an implementation plan that can guide capital investment projects. This process can help campuses: o Determine the capability of existing utility systems to serve future needs. o Determine efficient and cost-effective ways to meet expected campus needs. o Determine the magnitude, cost, and timing of needed campus utility projects. o Develop institutional support for needed projects. o Create a capital investment plan for needed improvements to the campus utility infrastructure and build resilience to future events. The scope of utility master planning efforts at Minnesota State colleges and universities will vary based on campus needs. Each Utility Master Plan will provide a broad overview of each service provided to the campus - including electrical power, heating, cooling, gas, domestic water, fire water, irrigation, sanitary sewer, storm sewer, compressed air, and standby/emergency generation systems. Additionally, each campus will identify systems that would benefit from an in-depth analysis. Expected outcomes include documentation of the basic information needed to effectively manage existing utility systems and a proposed implementation plan for future utility projects. In addition to major projects that require capital investment, the implementation plan is expected to include immediately actionable, low-cost strategies that result in operational cost savings. Taking a comprehensive and intentional approach to utility planning enables system efficiencies that can minimize operational costs and play a key role in sustainability efforts The method of Contractor Selection has not been Determined at this time.
Conceptual
Educational
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 25, 2024
1450 College Way, Worthington, MN
Related To This Project
Worthington, MN
--
Worthington, MN
--
Worthington, MN
--
Worthington, MN
Bid Date: Sep 13 2024
Worthington, MN
Bid Date: Aug 27 2024
Worthington, MN
Bid Date: Sep 12 2024
Worthington, MN
Bid Date: Nov 19 2024
Worthington, MN
Bid Date: Dec 12 2024
Worthington, MN
Bid Date: May 29 2024
Worthington, MN
Bid Date: May 29 2024
Worthington, MN
Bid Date: May 14 2024
Worthington, MN
Bid Date: May 08 2024
Worthington, MN
Bid Date: May 08 2024
Worthington, MN
Bid Date: May 08 2024
Worthington, MN
Bid Date: Apr 04 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.