Site work and paving for a mixed-use development in Mendham, New Jersey. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; road / highway; and road / highway.

https://patch.com/new-jersey/mendham-chester/road-work-begins-mendham-borough-monday-see-details Road Work Begins In Mendham Borough Monday: See The Details Crews begin milling work on Bliss Road and Pleasant Valley Road on Monday, with the project expected to continue through the week. Michelle Rotuno-Johnson's profile picture Michelle Rotuno-Johnson, Patch Staff Verified Patch Staff Badge Posted Mon, Jun 10, 2024 at 9:37 am ET | Updated Mon, Jun 10, 2024 at 9:38 am ET This project is part of the 2024 Mendham Borough Capital ImprovementProgram for local streets and roads. Riverview Paving is the crew on this project, which was contracted through the Morris County Co-Op. This project is part of the 2024 Mendham Borough Capital Improvement Program for local streets and roads. Riverview Paving is the crew on this project, which was contracted through the Morris County Co-Op (David Giuliani/Patch) MENDHAM BOROUGH, NJ -- Heads up, drivers! Officials in Mendham Borough posted information about a milling and paving project that will begin Monday. Milling is scheduled to begin June 10 along Bliss Road and Pleasant Valley Road, and continue until Wednesday (weather permitting). Paving work is scheduled to begin shortly thereafter, officials added. Construction work normally begins at 7 a.m. One lane of traffic will be maintained through the construction, though there may be instances throughout the day when a street will need to be closed. The borough's Department of Public Works will try to keep travel disruptions to a minimum, officials said. This project is part of the 2024 Mendham Borough Capital Improvement Program for local streets and roads. Riverview Paving is the crew on this project, which was contracted through the Morris County Co-Op. Find out what's happening in Mendham-Chesterwith free, real-time updates from Patch. Your email address Subscribe Anyone with questions may contact the Department of Public Works at 973-543-6535 weekdays between 7 a.m. and 3 p.m. Officials provided the following information for nearby residents: Construction work normally begins at 7 a.m. (crews and trucks arrive earlier) Please do not park on the street while the construction crew is working in your area. If you need to enter or exit your driveway or neighborhood and the construction crew is present, please wait for either a Riverview Paving employee or a DPW employee to assist you. One lane of traffic will be maintained throughout the construction. There may be instances throughout the day when the need arises to block the street for short periods of time. These will be kept to a minimum. After milling has taken place, please be aware that manholes, water shut offs and storm water basins will be exposed. We will paint and place cones in these locations. Please slow down and go around the cones. Your street will be milled for a few days before being paved. The paving crew can only work in dry weather. If we experience prolonged wet weather, your street may stay milled longer than expected. ___________________________________________________ Reference Number 0000352895 Milling & Resurfacing, Main St & Mendham Rd (C.R. 510) in the Township of Mendham, Borough of Mendham and the Township of Morris for the Morris County Department of Public Works, Division of Engineering & Transportation consisting of, but not limited to, 110,780 S.Y. - HMA Milling, 3" or Less, 13,920 Tons - Hot Mix Asphalt 9.5M64 Surface Course, 15 S.Y. - Concrete Sidewalk, Reinforced, 6" Thick, 200 S.Y. - Concrete Sidewalk, Reinforced, 6" Thick, Gray, 43 S.Y. - Detectable Warning Surface, 45 L.F. - 9"x20" Concrete Vertical Curb, 600 L.F. - 9"x20" Concrete Vertical Curb, Gray, 295 L.F. - Granite Curb, 1,660 L.F. - Beam Guide Rail, 20 Unit - Tangent Beam Guide Rail Terminal, 66 L.F. - 15" Reinforced Concrete Pipe, Class V, 120 L.F. - 10" Ductile Iron Pipe, Class 52, Reconstructed & Reset Inlets/Castings, Warning & Regulatory Signs, in addition to other miscellaneous items. Each bid must be accompanied by a certified check, cashier's check or bid bond in the amount of ten percent (10%) (not to exceed $20,000.00) of the total bid, payable to the County of Morris, as a guarantee that if the contract is awarded to the Bidder, will enter into a contract and provide the necessary bonds and insurance as required by the County and the Division of Risk Management. The successful Bidder will be required to furnish a Performance Bond, Payment Bond and Maintenance Bond as specified in the Contract Documents. EACH BID MUST BE ACCOMPANIED WITH A CONSENT OF SURETY which states that the surety company will provide the Bidder with the performance bond specified in the Contract Documents in the event the Bidder is awarded the Contract. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27. Question Deadline 05/20/2024 at 12:00 AM ET Questions are submitted online No . The vendor shall maintain all documentation related to products, transactions, or services under this contract for a period of five years from the date of final payment. Such records shall be made available to the New Jersey Office of the State Comptroller upon request. Bid date: Bids must be enclosed in a sealed envelope bearing the name and address of the bidder, and the Bid number and title spelled out on the outermost packaging, addressed to the Purchasing Agent of the County of Morris. Clearing site shall also include the removal of culvert pipe, headwalls, signs, inlets, trees, grubbing of tree stumps and backfilling holes resulting from tree removal. Any trees in conflict with construction shall be removed only when approved by the Engineer. Clearing Site shall also include the removal and resetting of any mailboxes, fences, curbing, utility service of other item which conflicts with construction whether or not it has been designated to be removed or reset in the plans. The Contractor is encouraged to walk the site to make his/her own determination of the items, which conflict with construction, which must be removed and/or reset. No additional payment will be given for items removed or reset by the Contractor during the course of construction, which have not been identified in the plans. Clearing site also includes meeting FRA 213, 213.37, AASHTO, and MUTCD line of sight requirements at road crossings and obstructions of signage. Trees and brush should be cleared within the railroad right of way to a point 250' in each direction from any railroad crossing.

Bid Results

Sidewalks / Parking Lot

$2,426,701.00

Public - County

Paving, Site Work

25

6

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
428
Active Projects
186
Bidding Soon
4,455
All Active Projects
1,976
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

June 28, 2024

img_map_placeholder

Mendham Rd & E Main St, Mendham, NJ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.