BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in Charlotte, North Carolina. Completed plans call for the construction of a 14,600-square-foot, two-story above grade fire / police facility; and for site work for a fire / police facility.

The City is seeking to award a contract to a design-build firm for a new two-story, approximately 14,600-square-foot facility located on Dixie River Road (Parcel Number 14128101 - Parcel 3). The facility will house the Charlotte Fire Department ("CFD") River District firefighters. The new firehouse will be all-electric and have a mass timber structural system and include 3 bays for fire trucks. It is anticipated the facility will achieve LEED Certification (minimum of Certified), as well as IFLI's Zero Carbon Certification. The building will also incorporate a geothermal system for HVAC, infrared bay heating as well as for domestic hot water. Questions Due Date: Jun 6th 2024, 5:00 PM EDT The City of Charlotte River District Firehouse 44 Phase II Project shall start construction September 1, 2025, with Substantial Completion taking place September 21, 2026 and completed and placed into operation by November 16, 2026 General The City is seeking to award a contract to a design-build firm for a new two-story, approximately 14,600- square-foot facility located on Dixie River Road (Parcel Number 14128101 - Parcel 3). The facility will house the Charlotte Fire Department ("CFD") River District firefighters. The new firehouse will be allelectric and have a mass timber structural system and include 3 bays for fire trucks. It is anticipated the facility will achieve LEED Certification (minimum of Certified), as well as IFLI's Zero Carbon Certification. The building will also incorporate a geothermal system for HVAC, infrared bay heating as well as for domestic hot water. 2.2 Project Objectives The overall Project objective is to design and construct the most effective firehouse to date through the strategies below: Design and construct a firehouse that will achieve design and construction excellence through innovative practices and applications. Maintain a safe, injury free work site. Minimize any scheduling, budgeting, and operational impacts to the Owner through close coordination and timely communication with the Owner, subcontractors, consultants, vendors, and its customers. Have the facility designed and constructed taking into consideration the criteria in the LEED Building Standard, and following the City's Sustainable Facilities Policy approved by Charlotte City Council on April 22, 2024. Design the facility in a way that enables it to be integrated into and reflective of the culture of the community it is located within the River District. Design the Facility based on City of Charlotte and Charlotte Fire Department input through the stages of design regarding building specifications and operational requirements. Provide up-to-date documentation on any requested and agreed upon program requirements from City and CFD to minimize changes are made during construction Complete the project on time and within the City's budget and optimize lifecycle costs with initial capital costs. Provide a project that reliably meets or exceeds all regulatory and permittingrequirements. Provide a project that supports the City's energy & sustainability goals through innovative and practical technologies, processes, or practices that take into account the City's targets such as the Strategic Energy Action Plan (SEAP) which strives to have facilities that use zero-carbon sources and LEED certification principles for buildings The budget for design-build contract for the project is approximately $14,500,000. - The total budget for the project (soft costs, design-build contract and FF&E) is approximately $21,650,000.

Post-Bid

Fire / Police

$1,000,000.00

Public - City

LEED Certification, New Construction, Site Work

7

11

4

3

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
104
Bidding Soon
1,705
All Active Projects
695
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 20, 2024

September 1, 2025

img_map_placeholder

To Be Determined, Charlotte, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.