Site work and paving for a civil project in Dobbin, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The base bid work consists of providing the necessary labor, materials, equipment and supervision to construct Two Step Boulevard - Mound Creek Segment including but not limited to, mobilization, bonds and insurance; construction of approximately 0.9 miles of asphalt roadway and associated roadside ditch/storm sewer infrastructure for drainage; MSE retaining wall, a 3,000 linear foot bridge; stormwater pollution prevention; pavement markings and signage; and all else shown on the construction drawings and detailed in the construction specifications. The deadline to ask questions is 6/12/2024 5:00 PM CST The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. The general Scope of Work for the Contract Documents includes the following: i. Clear areas shown on Contract Documents of obstructions and objectionable materials, including stumps, overhangs, trees, shrubs, logs, trash, rubbish, and other debris in conflict with construction. Haul off all vegetation cleared and dispose offsite. Chipping and spreading on-site will not be permitted. Burning will not be permitted. No clearing shall be completed outside of limits noted on plans without Engineer approval. ii. Strip existing topsoil in areas requiring earthwork. Undesirable material (organic material, wet, soft, or loose soil) in place shall be removed. iii. Install stormwater pollution prevention measures per Contract Documents. iv. Install, maintain, and remove temporary low water crossings or culverts within project limits per Contract Documents. v. Proof-roll exposed soil subgrade. Undesirable material (organic material, wet, soft, or loose soil) in place shall be removed and replaced with well-compacted material. Prior to placement of fill, exposed soil subgrade should be scarified to a minimum depth of 6 inches and recompacted. vi. Perform earthwork, including excavation and fill to final grades shown on Plans. Stockpile excess excavated material on site in location approved by Engineer/Inspector. vii. Install asphalt pavement, bridge, and MSE walls. Install slope paving at bridge abutments. viii. Install traffic control plan per Contract Documents prior to connection of pavement to Fish Creek Thoroughfare. Contractor shall maintain and be responsible for positive drainage during all phases of construction and shall maintain access to all existing roads and driveways throughout project. ix. Perform site restoration, including turf establishment. x. Clean-up project area upon completion.
Bid Results
Roads / Highways
$15,889,648.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2024
August 1, 2024
Multiple Locations, Dobbin, TX
Related To This Project
Dobbin, TX
Bid Date: May 30 2024
Dobbin, TX
Bid Date: Jun 14 2024
Dobbin, TX
Bid Date: May 30 2024
Dobbin, TX
Bid Date: Jun 17 2024
Dobbin, TX
Bid Date: Jun 19 2024
Dobbin, TX
Bid Date: Jun 21 2024
Dobbin, TX
Bid Date: Jun 27 2024
Dobbin, TX
Bid Date: Jul 31 2024
Dobbin, TX
Bid Date: May 28 2024
Dobbin, TX
Bid Date: May 23 2024
Dobbin, TX
Bid Date: May 21 2024
Dobbin, TX
Bid Date: May 16 2024
Dobbin, TX
Bid Date: Jun 14 2024
Dobbin, TX
Bid Date: May 15 2024
Dobbin, TX
Bid Date: May 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.