Renovation of an educational facility in Edison, New Jersey. Completed plans call for the renovation of a educational facility.

Bid for Billy Johnson Hall installation of Boilers, Pumps and Associates Accessories Questions Due Date: Oct 30th 2024, 4:00 PM EDT This work will be performed at Billy Johnson Hall located on the Middlesex College Campus in Edison, New Jersey. The purpose of this project is to upgrade the existing heating system located in the mechanical room of the building. Billy Johnson Hall (BH) is a two-story building, with the mechanical room located in a below grade partial basement level. The building was constructed in 1990 and totals approximately 44, 024 square feet. The construction is steel frame/concrete composite and consist of engineering laboratories, study spaces, amphitheater-style lecture hall, classrooms, and administration areas for various departments. The College has pre-purchased the boilers, pumps, pump variable frequency drives (VFDs) piping specialties and pipe, valves and fittings. These materials shall be installed by the contractor. It will be the contractor's responsibility to inventory all of the items listed in Appendix A of this document and provide and install any and all additional materials required to complete the project, including insulation of the new boiler piping. The Boiler manufacturer's (Aerco) boiler start-up service has been pre-purchased by the College The contractor will be responsible for notifying the College when the boilers are ready for start-up so arrangements can be made by the College. The contractor shall provide all of the necessary labor, materials, tools, and equipment required to complete the work described on the drawings and in the specifications. a. BASE BID Install the three Owner supplied Aerco boilers, two end suction centrifugal base mounted pumps with flex-coupled motors, associated pipe, valves and fitting with required piping specialties, controls and necessary electrical. As necessary, remove piping, electrical, plumbing and other modifications as shown on the drawings to facilitate the Base Bid work. b. ALTERNATE 1 Demolish and remove abandoned piping as indicated on drawings. c. ALTERNATE 2 Demolish and remove existing Weil-McLain boiler. Abandon housekeeping pad in place.

Post-Bid

Educational

Public - County

Renovation

16

13

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
433
Active Projects
173
Bidding Soon
4,347
All Active Projects
1,790
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2024

December 9, 2024

img_map_placeholder

Multiple Locations, Edison, NJ

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.