BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Mississippi State, Mississippi. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Summer Paving 2024 The right is hereby reserved to waive informalities. Mississippi State is an equal opportunity/affirmative action employer 1.1 WORK SEQUENCE A. The Contractor must be complete with all work in accordance with the Project Manual and Drawings on or before ________. OR within __35___ calendar days of issuance of notice to proceed. B. WORK RESTRICTIONS 1. Work is not allowed on the following days: home football game days, fall graduation and spring graduation. a. Coordinate work so that it does not interfere with use of facilities. C. PROJECT COORDINATION 1. General Contractor Staff: Contractor shall provide the following minimum staff for the project and shall provide any additional staff as necessary during the Work: a. Offsite: 1) Project Manager b. Onsite: 1) Project Superintendent D. Survey Verification of Existing Conditions: The Contractor shall be responsible for field dimensioning the existing conditions of the project site and the building, especially as it relates to connection/tie-in locations. The contractor shall employ or assign a qualified surveyor to perform survey of existing structure that is in contact with new structure within 45 days of Notice to Proceed. General Contractor shall report findings to the Architect within 1 week of survey. This will require the Contractor to field verify the existing structure prior to shop drawing completion and submission to ensure that the work under this scope will be coordinated with the existing structure and systems. Notify the design team immediately of any variances from the project documents as it relates to the existing facility. E. Deficiency Log - The General Contractor shall maintain a log of deficiencies noted by the design team or owner's representative. The log shall be per the attached form. The log shall track the items from the date they were noted to the date they were completed. The log shall include a picture of the corrected item after correction to document the completion of each item. The General Contractor shall maintain this log and update project team weekly of the status. The deficiencies log shall be submitted with the monthly pay application. The estimated value of repairing any item that is over thirty (30) days old shall be deducted from the progress payment. This shall be on a spreadsheet format and saved on a shared folder with design team and owner. F. Daily Reports - The Contractor's Superintendent will prepare a report daily which includes as a minimum the Contractor's force on site by craft and skill level and their efforts of the day, supervision, material deliveries, problems encountered, inspections and their results, milestone achieved, significant items of work accomplished or attempted, delays or disruptions that occur, visitors and special instructions which effect their work. Reports shall be uploaded on a weekly basis. G. Site Logistics Plan - thirty days before beginning each phase the Contractor shall submit a Site Logistics Plan for review. At a minimum the plan shall include construction entrances, specific material lay down areas, temporary toilet facilities, access roads and hoisting plans.

Post-Bid

Roads / Highways

$300,000.00

Public - State/Provincial

Paving, Site Work

7

7

4

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
61
Bidding Soon
664
All Active Projects
341
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 19, 2024

July 18, 2024

August 22, 2024

img_map_placeholder

Multiple Locations, Mississippi State, MS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.