Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Chicago, Illinois. Contact the soliciting agency for additional information.
This Request for Statements of Interest (RSI) is step one of a two-step qualification selection process in determining the most qualified consultant ("Consultant") for the award of the contract. For Step two, Cook County will issue a Request for Qualifications (RFQ) to the shortlisted firms that have responded to the RSI. The Cook County Department of Transportation and Highways is requesting Statements of Interest (SOIs), in providing Consultant Services to perform Preliminary Engineering Services and Preparation of Phase I Study for the 1st Avenue and Union Pacific Railroad Grade Separation (CREATE GS12). It is the County's intent to award one (1) contract. The general scope of the project, prequalification requirements, and tentative schedule is described under Exhibit 1. To be considered, firms must upload the Statement of Interest (SOI) to Bonfire in accordance with the SOI due date and time listed on the Cover Page of this RSI. SOI submittals received after that time will not be accepted or considered by the County. No oral representations made by the County shall be binding This project includes the preparation of a full preliminary engineering and environmental (Phase I) study (through design approval) for a grade separation of 1st Avenue where it crosses the Union Pacific Railroad's tracks located in the Village of Maywood (see location map below) along with preparation of land use and urban design recommendations for the neighborhood immediately surrounding the project for each alternative to be carried forward. The Phase I study shall be completed in accordance with the respective requirements from Cook County and the Illinois Department of Transportation (IDOT). It is currently anticipated that the Phase I study will follow either the Planning and Environmental Linkages (PEL) study or National Environmental Policy Act (NEPA) scoping process, as directed by IDOT and Federal Highway Administration (FHWA) in the early stages of the project. The Phase I study is federally funded by the Surface Transportation Program (STP) Shared funds and therefore, the selected consultant must perform these services in a manner which fulfills all criteria related to standards, codes, and procedures for federally funded projects. Owner Rights: The County reserves the right to reject any and all submissions, to waive any informality in the submissions and, unless otherwise specified by the Submitter, to accept any item in the submissions. The County also reserves the right to accept or reject all or part of any submission, in any combination that is economically advantageous to Cook County. All costs associated with the preparation of the firm's SOI will be solely the responsibility of the firm. Any response submitted in response to this RSI shall become the property of the County and will not be returned. The County is not obligated either to purchase the full services or the products proposed by the proposer, nor to enter into an agreement with any one proposer. Lastly, the County reserves the right to cancel this solicitation in part or in its entirety.
Conceptual
Roads / Highways
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 29, 2024
1st Ave., Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Nov 26 2024
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Dec 12 2024
Chicago, IL
Bid Date: Nov 26 2024
Chicago, IL
Bid Date: Nov 27 2024
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Nov 21 2024
Chicago, IL
Bid Date: Nov 26 2024
Chicago, IL
Bid Date: Dec 19 2024
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.