Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a transportation facility in Durant, Oklahoma. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
Remove Damaged HMAC and PCC Pavement Replace Damaged Pavement with HMAC Pavement Section Removal and Remarking of Replace Airfield Pavement Question Deadline 11/14/2024 Estimate: $100,000 - $150,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. THE PROPOSED WORK includes: o Removal and Replacement of Taxiway A1 Pavement Please submit questions for this project at least 7 days prior to bid opening through website in the Q&A portal or to the Engineer. All addenda issued for this project will only be posted on website. SCOPE OF WORK: The Contractor shall furnish all materials required and shall furnish all labor, equipment, tools, machinery, superintendence and all else required to complete all construction according to the "Proposal" and as shown on the plans for the contract. The work covered under this contract includes the construction of apron improvements as shown on the plans and all appurtenances and related items Alteration of work and quantities. The Owner reserves the right to make such changes in quantities and work as may be necessary or desirable to complete, in a satisfactory manner, the original intended work. Unless otherwise specified in the Contract, the Owneris Engineer or RPR shall be and is hereby authorized to make, in writing, such in-scope alterations in the work and variation of quantities as may be necessary to complete the work, provided such action does not represent a significant change in the character of the work. For purpose of this section, a significant change in character of work means: any change that is outside the current contract scope of work; any change (increase or decrease) in the total contract cost by more than 25%; or any change in the total cost of a major contract item by more than 25%. Work alterations and quantity variances that do not meet the definition of significant change in character of work shall not invalidate the contract nor release the surety. Contractor agrees to accept payment for such work alterations and quantity variances in accordance with Section 90, paragraph 90-03, Compensation for Altered Quantities. Should the value of altered work or quantity variance meet the criteria for significant change in character of work, such altered work and quantity variance shall be covered by a supplemental agreement. Supplemental agreements shall also require consent of the Contractoris surety and separate performance and payment bonds. If the Owner and the Contractor are unable to agree on a unit adjustment for any contract item that requires a supplemental agreement, the Owner reserves the right to terminate the contract with respect to the item and make other arrangements for its completion. THE CONTRACTOR hereby agrees to commence work within ten (10) days after the date written notice to do so shall have been given to him, and to substantially complete the same within 14 calendar day for the entire project after the date of the written notice to commence work, subject to such extensions of time as are provided by the General and Special Conditions.
GC Bidding
Transportation Terminals
$150,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2024
December 23, 2024
10 Waldron Rd, Durant, OK
Related To This Project
Durant, OK
Bid Date: May 31 2024
Durant, OK
Bid Date: Jun 27 2024
Durant, OK
Bid Date: Jun 25 2024
Durant, OK
Bid Date: Jun 25 2024
Durant, OK
Bid Date: Aug 07 2024
Durant, OK
--
Durant, OK
Bid Date: Jul 26 2024
Durant, OK
Bid Date: Aug 19 2024
Durant, OK
Bid Date: Jun 14 2024
Durant, OK
Bid Date: May 09 2024
Durant, OK
Bid Date: Apr 25 2024
Durant, OK
Bid Date: Apr 12 2024
Durant, OK
Bid Date: Apr 12 2024
Durant, OK
Bid Date: Mar 27 2024
Durant, OK
Bid Date: Mar 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.