BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Ellensburg, Washington. Completed plans call for the renovation of a educational facility.

Sealed bid proposals will be accepted for the following project: Purser Hall Roof Replacement Preparation of the existing roofing system and replacement of select roofing components and accessories prior to installation of a new coating system on Purser Hall on the CWU Campus. Alternate 1 includes the removal of the entire roofing system skylights and other components and the installation of a new roofing system, skylights and coating system on the Aquatics Facility on the CWU Campus ESTIMATED COST: $1,000,000-1,200,000 Shortly after 3:00 PM Pacific Time, a tabulation of the bids received will be provided by the University by replying to the email address associated with the bid. Documents may a so be viewed at the Office of capital planning and projects Jongeward plant services Building, Room 101, 205 E 11th Avenue, Central Washington University, Ellensburg, WA. 98926. Please direct questions regarding this project to the office of the Consultant, Starling Whitehead & Lux Architects, Attn: Eduardo Pichardo 901 Fifth Avenue, Suite 3100, Seattle, WA 98164, telephone (206; 682-8300, pichardo@swlarchitects.com. Question Deadline 06/04/2024 No bidder may withdraw its bid after the hour set for the opening thereof unless the award of the contract is delayed for a period exceeding 60 days. The Owner reserves the right to accept or reject any or all bids and to waive informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project entails the cleaning and installation of a liquid-applied, monolithic roof membrane systsem over the entire (13,300 SF approx.) existing SBS roofing on Purser Hall. The scope of work also includes: Removal and installation of two new roof access hatches. 4 new downpouts at the monitor roof. If Alt. Bid Item No. 1 is accepted, the project will include a complete removal of the 17,533 aprox sq ft of the IRMA roof assembly down to the structural metal deck and replace will a new fully adhered roof assembly. The scope of work also includes: Removal and installation of a new roof access hatch. Removal and replacement of two 4' x 100' skylights

Bid Results

Educational

$1,200,000.00

Public - State/Provincial

Renovation

14

10

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
12
Bidding Soon
208
All Active Projects
77
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

August 12, 2024

img_map_placeholder

1601-1699 N Walnut St, Ellensburg, WA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.