BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Fort Stockton, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project scope will include repair and renovation of the following city streets: 1. North Rio (West) from Dickinson Boulevard to IH-10 South Service Road Approximately 18,096 square yards 2. North Rio (East) from Dickinson Boulevard to IH-10 South Service Road Approximately 123,547.65 square yards 3. West Hornbeck from US Hwy 285 to FM 1053 Approximately 71,466.67 square yards The Bidder will be responsible for 1. Prepping area as needed. 2. Removal and disposal of old asphalt and excavated soil. 3. Apply caliche if needed. 4. Proper compaction of caliche. 5. Apply asphalt evenly 6. Proper compaction of asphalt. 7. Proof rolling The contract will be awarded either to the lowest responsible bidder or to the bidder who provides goods or services at the "best value" for the city." It is understood that the City reserves the right to accept or reject any and all Sealed Bids and to re-solicit for Sealed Bids, as it shall deem to be in the best interests of the City. Receipt and consideration of any Sealed Bids shall under no circumstances, obligate the City to accept any Sealed Bids. If an award of contract is made, it shall be made to the responsible Bidder whose Sealed Bid is determined to be the best evaluated submission. Therefore, it is in the best interest of the City of Fort Stockton to obtain the services of the highest qualified general contractor to assist in providing the City with all the necessary tasks, including providing equipment, machinery, labor, and supplies for repairing and renovation of those certain city streets identified within the City of Fort Stockton The City Council reserves the right to accept the bid which, in its judgment, is from the most responsible contractor; to reject any or all bid; and to waive irregularities or informalities in any bid submitted.

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
65
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

August 19, 2024

img_map_placeholder

N Rio St & W Hornbeck Blvd, Fort Stockton, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.