BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Springfield Township, Ohio. Design plans call for site work for a road / highway; and for paving for a road / highway.

https://www.bizjournals.com/cincinnati/news/2024/08/14/great-parks-input-west-region-blueway-bike-trail.html Great Parks of Hamilton County is considering how to build a new 25-mile pedestrian/bicycle trail that would connect together the western part of Hamilton County, a place where there is a dearth of such infrastructure. It's calling the project the West Region Blueway and Trail System. The trail would connect the Ohio River and run near the Great Miami River, as well as four of the county's parks, Miami Whitewater Forest, Oak Glen Preserve, Mitchell Memorial Forest and Shawnee Lookout. Through Sept. 1, citizens can attend a virtual open house to share their thoughts on the trail and its potential alignment on the Great Parks website. The park system already has discussed the plan with local residents, municipal leaders, businesses, interest groups and other stakeholders. "The community prioritized building more trails through the development of our comprehensive master plan, and Great Parks is working to honor that priority," Great Parks CEO Todd Palmeter said in a news release. "Now that we can share a proposed alignment, we're eager to continue these discussions to move closer to a final plan for the trail." Great Parks also is expanding peoples' ability to use the rivers, including new watercraft launch sites for paddling adventures along the Great Miami and the Whitewater River. The trail will start along the Hamilton-Butler county border near Fairfield and run along the Great Miami River south to the Ohio River. It is an extension of the 99-mile Great Miami River Trail. The trail generally will be paved and separate from roadways. The trail's master plan will be completed in 2024, with construction coming in phases, based on funding availability and site control. Such trails can take a decade or more to complete. The costs are unclear. ____________________________________________________________________________________________________________________________________________ As of May 17, 2024, an engineer has been selected and this project is in the design phase. It is anticipate to start construction in spring 2025. The new trail will extend the West Fork Mill Creek Greenway Trail that currently travels through Wyoming, Woodlawn, and Glenwood Gardens to connect with the Harbor Loop Trail in Winton Woods. The trail will link other trails, neighborhoods, parks, shopping, schools, and community resources from Springfield Township and Greenhills to Woodlawn and Wyoming, including parks, schools and shopping in between. Once complete, the trail network in this area will offer more than nine miles of continuous shared-use paths built for exercise, recreation, and vehicle-free travel away from busy local roadways. Guests can choose between more routes of different lengths and more experiences that flow from gardens and prairies to wetlands, forests and lakes.

Design

Roads / Highways

$1,000,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
54
Bidding Soon
1,215
All Active Projects
557
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

img_map_placeholder

Multiple Locations, Springfield Township, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.