BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Palo Alto, California. Conceptual plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

Summary The City of Palo Alto seeks a consultant to evaluate the Arastradero Creek tributary and complete a design, with approval from the jurisdictional permitting agencies, to address the source of a six-foot head cut and protect critical water, gas, and wastewater utility pipelines crossing the Arastradero Creek. The work will take place in Arastradero Creek in the Pearson-Arastradero Preserve in the City of Palo Alto. The project site is located approximately 1,300 linear feet upstream from Lake Arastradero. Background In March 2023, the City was informed of an exposed 8-inch diameter steel gas pipeline in the Arastradero Creek in the Pearson-Arastradero Preserve. The City received approval from the Army Corps of Engineers, under an emergency (RGP) 5 permit, to complete a temporary creek stabilization project to protect the gas pipeline from damage from future storms. As part of the project, the City installed a combination of cobbles and boulder revetments in the eroded channel bed to protect the 8-inch diameter gas pipeline and prevent the upstream 16-inch potable water transmission and 16-inch sewer pipeline from being exposed. The San Francisco Regional Water Quality Control Board (SFRWQCB) has required the City to complete a permanent creek stabilization project to address the 6-foot head cut and remove all temporary fill placed under the RGP 5 permit. All documents related to the temporary creek stabilization project are included for reference. The primary objectives of this project are the following: Determine and investigate the source of a six-foot head cut in Arastradero Creek and evaluate at a minimum the three options listed below (other options are acceptable as long as these options are evaluated and documented why they are not the best solutions) Survey and collect comprehensive data for background information, hydro monitoring, topography analysis, and Hydrologic & Hydraulic modeling purposes. Propose the most efficient and cost-effective project design for approval; Obtain all required permitting and adhere to all permitting requirements throughout the project; Complete the approved long-term creek stabilization project design, including a design for restoration of the roadway for project site access; Perform all monitoring and reporting required of the permits during construction and post-construction for project closeout. See below for the list of options identified by the SFRWQCB to be evaluated in this proposal: Option 1: Modifying Lake Arastradero; Option 2: Lowering utility pipelines below the predicted equilibrium slope of the head cut or Option 3: Implementing a larger stabilization design with multiple grade control features. If the City chooses to proceed with Option #2, the City may perform the Engineering design services with City resources. The Consultant may be required for services related to the permitting, monitoring, and reporting when lowering the utility pipelines. Contact Information Procurement Contact: Ann Marie Romero Contracts Administrator annmarie.romero@cityofpaloalto.org (650) 329-2460 Question Submission Deadline: May 28, 2024, 1:00pm. Should discrepancies or omissions be found in this RFP or should there be a need to clarify this RFP, questions or comments regarding this RFP must be submitted electronically. Responses from the City will be provided through electronically. Rights of the City of Palo Alto This RFP does not commit the City to enter into a contract, nor does it obligate the City to pay for any costs incurred in preparation and submission of proposals or in anticipation of a contract. The City reserves the right to: Make the selection based on its sole discretion Reject any and all proposals Issue subsequent Requests for Proposals Postpone opening for its own convenience Remedy technical errors in the Request for Proposals process Approve or disapprove the use of particular subconsultants Negotiate with any, all or none of the Proposers Accept other than the lowest offer Waive informalities and irregularities in the Proposals and/or Enter into an agreement with another Proposer in the event the originally selected Proposer defaults or fails to execute an agreement with the City An agreement shall not be binding on the City unless and until it is executed by authorized representatives of the City and of the Proposer. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$400,000.00

Public - City

Renovation, Site Work

16

5

7

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
41
Bidding Soon
1,471
All Active Projects
639
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

img_map_placeholder

Arastradero Creek Trail, Palo Alto, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.