BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Santa Clara, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

DESCRIPTION OF WORK. The Work shall consist of removing existing curb, gutter, and sidewalk, installing 42 curb ramps with raised truncated domes, and reconstruction of curb, gutter, and sidewalk at 17 intersections as shown on the Plans. Work also includes removal and replacement of existing striping/crosswalks, storm drain improvements, new striping, sign posts, and pavement markings. This Project is Utilizing Community Development Block Grant (CDBG) Funds and is Subject to All Federal Rules and Regulations Included in Document 00910 of These Contract Documents. This Contract Requires Compliance With Federal Labor Standards Provisions and the Davis-bacon Act Prevailing Wage Requirements. Bidders Are Put on Notice That All Work Must Strictly Comply With State or Federal Accessibility Requirements, Whichever is More Stringent. CONTRACT TIME. The Work shall reach Substantial Completion within Forty-five (45) Working Days from the date when the Contract Time commences to run. The Work shall reach Final Completion within Fifty-five (55) Working Days from the date when the Contract Time commences to run. See Document 00050, References and Definitions, for definitions of Substantial Completion and Final Completion. The Project has a deadline for final application for payment by March 31, 2025. The Project shall be completed by this deadline. Q & A deadline: Jun 06, 2024 3:00:00 PM MT REQUIRED CONTRACTOR'S LICENSE(S). A California "A" contractor's license is required to bid this contract. Joint ventures must secure a joint venture license prior to award of this Contract. PREVAILING WAGE LAWS. The successful Bidder must comply with all prevailing wage laws applicable to the Project, and related requirements contained in the Contract Documents. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Bidders are solely responsible for the cost of preparing their Bids. City specifically reserves the right, in its sole discretion, to reject any or all Bids, or re-bid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work.

Bid Results

Sidewalks / Parking Lot

$543,214.00

Public - City

Paving, Site Work

16

19

3

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
43
Bidding Soon
1,446
All Active Projects
626
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

September 2, 2024

img_map_placeholder

Multiple Locations, Santa Clara, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.