Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Warrensburg, Missouri. Completed plans call for the renovation of a water / sewer project.
https://www.spartnerships.com/pipeline/2024/government-contracting-pipeline-07-10-2024.html Missouri water company invests $500 million in water, wastewater infrastructure Missouri American Water (MAW) is investing more than $500 million to improve statewide water and wastewater infrastructure. Projects include replacing more than 90 miles of aging water pipes and enhancing water treatment plant performance. MAW recently released its 2023 Water Quality Reports covering the safety and quality of local drinking water sources. The reports describe local sources, summarize water testing, list substance levels in the water and provide instructions on protecting drinking water. The consumer reports, covering 47 regions in Missouri, indicate that contaminants in local drinking water supplies are negligible and that MAW meets and exceeds state and federal drinking water standards. To maintain reliable water service, the company will support projects across 10 water treatment plants. MAW will upgrade St. Louis County’s south water treatment plant by replacing its intake pumps and chemical feed systems. The replacement intake station will improve reliability and mitigate flooding. Plans include building a structure for the chemical storage and feed systems to improve the water treatment process. MAW will build a filter building at the Jefferson City water treatment plant. In addition, the company will invest in upgrading booster stations in St. Joseph and building wastewater lift stations in Eureka, Maplewood and Smithton. Plans include building a carbon feed system and replacing the chlorine feed system at the Joplin water treatment plant. Finally, MAW will replace the ozone system at the Warrensburg water treatment plant. As part of the investment, MAW will allocate $100 million to identify lead service lines across the state and replace them with galvanized steel. The company intends to remove all lead service lines by 2030, allowing it to meet and exceed federal requirements. MAW has replaced approximately 10,000 lead service lines to date. Residents can self-report on unidentified local service lines and request a professional inspection. (Photo courtesy of Ivan Bandura on Unsplash.) ________________________________________ The City of Warrensburg, MO (City or Owner) is seeking qualifications from contractor(s) to provide Construction Management at Risk (CMAR) services in the delivery of the West and East Wastewater Treatment Plants Improvements Project (Project). The Project includes expansion of the East Plant from 1.5 MGD to 2.0 MGD and the West Plant from 1.5 MGD to 2.0 MGD. Written requests for information should be directed to: Cole Duckworth, PE HDR Engineering, Inc. 10450 Holmes Road, Suite 600 Kansas City, MO 64131-3471 816-347-1106 Cole.Duckworth@hdrinc.com. BACKGROUND INFORMATION The City of Warrensburg, Missouri owns and operates two wastewater treatment plants (WWIPs), East WWTP and West WWTP, as shown in the following Figure. The West WWTP is located at 75 Northwest 50 Highway with legal description SW 14, NW 14, Section 14 Township 46N and Range 26W. The East WWTP is located at 441 NE 300 Road with legal description Section 03 Township 46N and Range 25W. Deadline for Questions June 18, 2024 at 5:00 pm. Final Addendum June 25, 2024.
Award
Water / Sewer
$200,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2024
November 4, 2024
Multiple Locations, Warrensburg, MO
Related To This Project
Warrensburg, MO
Bid Date: May 29 2024
Warrensburg, MO
Bid Date: Jun 26 2024
Warrensburg, MO
Bid Date: Nov 19 2024
Warrensburg, MO
Bid Date: Jul 25 2024
Warrensburg, MO
Bid Date: Jun 28 2024
Warrensburg, MO
Bid Date: Jul 18 2024
Warrensburg, MO
Bid Date: Aug 09 2024
Warrensburg, MO
Bid Date: Sep 10 2024
Warrensburg, MO
Bid Date: May 23 2024
Warrensburg, MO
Bid Date: May 10 2024
Warrensburg, MO
Bid Date: May 23 2024
Warrensburg, MO
Bid Date: May 10 2024
Warrensburg, MO
Bid Date: May 03 2024
Warrensburg, MO
Bid Date: May 01 2024
Warrensburg, MO
Bid Date: May 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.