Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 20, 2024 at 8:00 PM
Updated May 24, 2024
Site work for a water / sewer project in Folsom, California. Design plans call for site work for a water / sewer project.
This project involves the construction of new water mains, valves, and other control devices to provide redundancy within the existing water distribution system for Willow Hill Reservoir. The Willow Hill Reservoir portion of work also includes installing a new valve structure to divert flow out of the reservoir as well as the design and installation of a new dock structure to operate the valve. Design of the Willow Hill Valve Project is currently under review with the Division of Safety of Dams (DSOD). Once approval from DSOD has been granted, design plans can be completed and construction can begin. Construction of the Willow Hill Valve is estimated to begin FY 2023-24 and be completed by 2024/2025. Project is included in the City of Folsom's FY 2024 Capital Improvement Program (CIP). As of May 20, 2024, information regarding a design team or a general contractor is not available. Construction is anticipated in 2024/2025.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Water / Sewer
$500,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2024
To Be Determined, Folsom, CA
Related To This Project
Folsom, CA
--
Folsom, CA
Bid Date: Jun 05 2024
Folsom, CA
Bid Date: Jun 04 2024
Folsom, CA
Bid Date: May 23 2024
Folsom, CA
Bid Date: May 23 2024
Folsom, CA
Bid Date: May 10 2024
Folsom, CA
Bid Date: May 10 2024
Folsom, CA
Bid Date: Jun 12 2024
Folsom, CA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
