BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2024 at 8:00 PM

Updated June 19, 2024

Demolition, site work, renovation and addition to an educational facility in Cedar Creek, Texas. Completed plans call for the addition of a 37,000-square-foot educational facility; for the demolition of a educational facility; for the renovation of a 37,000-square-foot educational facility; and for site work for a educational facility.

Bartlett Cocke is the Construction Manager at Risk for the Cedar Creek High School additions and renovations project. This project scope includes an addition of a new Academic Building for Classrooms and Dance spaces, renovations to 3 existing classrooms, and new HVAC reno in existing band spaces. This package includes GMP01 which will be early steel procurement and early procurement of RTU's & MAU's. All other scope items will be bid as 100%DD's this round (including steel erection and all other HVAC scope items). Please see the separate ITB for 100% DD scope also due on June 13, 2024 by 2pm (please price these items as a completely separate number/proposal). Overview: -37,000ad two story stand-alone new addition to Cedar Creek HS -Three interior classroom modifications to accept sky bridge -Slab on grade(excavate w/ select fill) -Steel structure with CFMF infill -Exterior masonry with metal wall panels -Finishes are standard for schools(VCT, polished concrete floors, level 4 wall finish, ACT) -Mechanical: RTU’s & MAU's -Electrical: standard fixtures and outlets for school classrooms -Plumbing: boys and girls gang restroom first floor, staff toilet on second floor -AV/Security/Access: standard for HS -Landscape: Exterior revegetation with outdoor area between existing HS and new addition -Utilities: Re-route some existing utilities for new building, extend existing, and add new. This is a wage rate project. Expected Start August 1, 2024 Expected Finish August 15, 2025 Addendum No. 1 and Memo #2 - Scope Sheets, Schedule, and Exhibit has been issued.* *Please reach out to Bartlett Cocke General Contractors for more information.

Post-Bid

Educational

$20,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

111

12

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
348
Active Projects
73
Bidding Soon
3,021
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

August 1, 2024

Project location map

793 Union Chapel Rd, Cedar Creek, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.