Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 17, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a bridge / tunnel in Plymouth, Indiana. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Project contract no-2400789 PROJECT NO. 0500024 & 0500025 P.E. Bridge Deck Overlay 030-50-04574 Continuous Steel Beam Marshall County - on Us 30e Over Western Avenue, 0.23 Mile West of Sr 17 Bridge Deck Overlay 030-50-04574 Composite Continuous Steel Beam Marshall County - on Us 30w at Western Avenue, 0.23 Mile West of Sr 17 Bridge Thin Deck Overlay 030-50-10239 Prestressed Concrete Bulb-t Beam Marshall County - on Us 30e Over Baker Ditch, 0.28 Mile East of Sr 17 Bridge Thin Deck Overlay 030-50-10240 Prestressed Concrete Bulb-t Beam Marshall County - on Us 30w Over Baker Ditch, 0.28 Mile East of Sr 17 Superstructure Repair and Rehabilitation 030-50-04574 Composite Continuous Steel Beam Marshall County - on Us 30w Over Western Ave, 0.23 Mile West of Sr 17 An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Bid Express does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 330 - Bridge Deck Overlay - US 30 Questions from interested parties concerning a contract shall be submitted at least five business days prior to the contract's scheduled letting date and time if an answer is desired prior to the letting.
Award
Bridges / Tunnels
$2,281,068.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2026
May 4, 2026
US-30, Plymouth, IN
Related To This Project
Plymouth, IN
Bid Date: Jun 10 2024
Plymouth, IN
Bid Date: Jun 10 2024
Plymouth, IN
Bid Date: Jun 14 2024
Plymouth, IN
Bid Date: Jun 25 2024
Plymouth, IN
Bid Date: Jun 25 2024
Plymouth, IN
Bid Date: Jul 08 2024
Plymouth, IN
Bid Date: Aug 19 2024
Plymouth, IN
--
Plymouth, IN
--
Plymouth, IN
Bid Date: Aug 14 2024
Plymouth, IN
--
Plymouth, IN
Bid Date: Mar 01 2024
Plymouth, IN
Bid Date: Mar 04 2024
Plymouth, IN
Bid Date: Oct 08 2019
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
