BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Farmington, New Mexico. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Project Description: The work to be performed under this contract shall consist of furnishing all labor, equipment, and materials to demolish the existing road on Foothills between Mesa Del Oso and Cheva Ct, reconstruct the road with two 11-foot wide travel lanes with 5-foot bike lanes, a 10-foot multi-use trail and improvements to the drainage structures. Requires a GA-98 license. The total bid for each Bid Schedule includes all work necessary to complete that portion of the project described in each Bid Schedule, and the total of all Bid Schedules represents the entire scope of work covered by the Contract Documents. If a particular item of work is not specifically separated as a bid item, the cost therefore shall be included in the bid item most nearly related. The total bid for each Bid Schedule is based on the quantities shown in this Bid Proposal and on the dimensions shown on the plans where specific quantities are not itemized. When Bid Schedules are based upon unit prices, the Contract Amount will be adjusted by change order at the corresponding unit prices according to the actual quantities and measurement of the finished construction as determined by the Field Engineer upon completion of construction. Due to the funding source, the Prime Contractor shall be on the NMDOT's Prequalified Contractors List at the time of bid opening to have their bid considered responsive. Subcontractors shall obtain prequalified status before performing any work or supplying goods or services to the project. Bidder further agrees to pay as liquidated damages in the amount of $2,000.00 for each consecutive calendar day thereafter that the work remains uncompleted. The Bidder shall submit with their bid a bid bond (proposal guarantee) equal to 5% of the total amount bid. The Engineer's Opinion of Probable Construction Costs (OPCC) is $1,868,909.61. Subcontractor's Listing Threshold: The Bidder shall list each Subcontractor on the Contractor's List of Subcontractor's, found in the attributes tab, that has provided a bid to them in the amount of $9,344.55 or more. The bidder certifies that this bid is genuine and is not made in the interest of, or on the behalf of, any undisclosed person, firm, or corporation, and that this bid has been arrived at independently, without consultation, communication or agreement as to any matter related to this bid with any other Bidder or competitor. Question Deadline 06/13/2024 at 4:00 PM MT

Post-Bid

Roads / Highways

$1,868,909.00

Public - City

Paving, Site Work

25

5

14

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
4
Bidding Soon
139
All Active Projects
53
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 25, 2024

August 26, 2024

img_map_placeholder

Foothills Dr, Farmington, NM

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.