BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Beverly Hills, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Wilshire Boulevard Improvements - Crescent Drive Intersection and Spot Repairs Project. Question Deadline 06/11/2024 at 2:00 PM PT All questions shall be emailed to Christine Chung at cchung@beverlyhills.org Liquidated Damages $1,500.00. Project Duration 130 working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% The work to be done shall consist of furnishing all the required labor, materials, equipment, parts, implements, supplies, and permits necessary for, or appurtenant to, the construction and completion of the project indicated above in accordance with the Standard Drawings and the Specifications prepared for this project. In general, the project consists of the addition of a crosswalk with traffic signal improvement, extension of a sidewalk, curb ramp replacements, full section pavement reconstruction, adjustment of existing utility boxes, concrete and pavement demolition, removal and haul away, replacement of pavement striping and markings, and incorporation of the City of Beverly Hills Wilshire Blvd- La Cienega Blvd Streetscape Standards sidewalk elements (tree, benches, pedestrian lighting, specialized sidewalk pattern, etc.) at the intersection of Wilshire Boulevard and Crescent Drive. In addition, the project includes other off-site improvements along Wilshire Blvd between Peck Drive and Rexford Drive. Such work includes curb and gutter replacement, repair and installation of bus pads, pavement spot repairs, and catch basin deck replacements along Wilshire Boulevard. The project may require the work to be performed at night, on weekends, or with other working hour restrictions depending on the work activities or coordination with other permitted work.

Award

Roads / Highways

$1,728,510.00

Public - City

Paving, Site Work

9

7

13

7

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
101
Bidding Soon
2,185
All Active Projects
968
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, Beverly Hills, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.