BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Antonio, Texas. Completed plans call for site work for a water / sewer project.

2021 CMOM Package 6B-Bore. For questions regarding this solicitation, technical questions or additional information, please contact Rodolfo Martinez, Contract Administrator, in writing via email to: Rodolfo.martinez@saws.org until 4:00 pm (CDT) on June 18, 2024. Answers to the questions will be posted to the website by 4:00 pm (CDT) on June 21, 2024 Electronic bids shall be accompanied by a bid bond in an amount not less than five percent of the total bid price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total bid price, SAWS will request this within 24 hours from the apparent low bidder. Sealed bids must be accompanied by a cashier's check, certified check, or bid bond in an amount not less than five percent of the total bid price. Estimate: $1,995,000.00. PN - CO-00714 Sealed bids are requested by the San Antonio Water System for the construction of approximately 300 LF of 12-inch PVC sanitary sewer main in 30-inch-steel casing by bore installation method, 20 LF of 12-inch PVC sanitary sewer main in 30-inch-steel casing by open-cut method and 54 LF of 12-inch PVC sanitary sewer main by open-cut installation method, including 8-inch sewer main grout abandonment and removal of sewer main, sanitary sewer manhole installation, abandonment, and rehabilitation, sewer bypass operations and traffic control for the 2021 CMOM Package 6B -Bore, SAWS Job No. 22-4525. The SBOP goal on this project is 21% Approximately 904 LF of 8-inch sanitary sewer main abandonment. Also includes landscaping, pavement restoration, including trench restoration and restoration of concrete pavement,sidewalks, and curb. Contractor shall abide by temporary construction easement (Childsafe property) defined in Exhibit B attached to the Contract Documents (Refer to section SC 2.2 for additional access and coordination information)

Bid Results

Water / Sewer

$1,448,154.00

Public - City

Site Work

23

7

12

10

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
110
Bidding Soon
2,918
All Active Projects
1,121
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 1, 2024

August 30, 2024

April 25, 2025

img_map_placeholder

Multiple Locations, San Antonio, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.