BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Mason City, Iowa. Completed plans call for the renovation of a detention facility.

A. Provide a turn-key solution that can last Cerro Gordo County Jail many years in the future. There are certain parts of the infrastructure that are inherent to the building and have a much longer life span or have service parts available still such as some wiring, door locks, etc. This scope does not require those parts to be replaced, it does require them to be tested, function with the new system, and be covered under future service agreements if they are not replaced. The project includes replacing the PLC cards, existing PLC cards and relays, existing power supplies, existing analog audio system, PLC processor, PLC I/O Cards, power supplies, network connections, and any other hardware as needed to operate should be replaced. The system shall have similar functionality that the jail currently has. B. The Audio rack should have new communication controllers, paging, switching, etc. It should also have similar functionality to the existing system. C. The Utility rack should have new PLC/I/O cards, power supplies, circuit breaker modules, relays, etc. It should also have similar functionality that the jail currently has. D. The project includes current card access and camera system upgrades. The new automation system should be able to integrate the cameras and doors with key fobs into it to allow similar functionality that the jail currently has. COMPLETIONDATE A. August15,2025 BIDSECURITY A. 5% PROJECTCOSTESTIMATE A. $1.45million Question Deadline 06/07/2024

Post-Bid

Jails / Prisons

$1,450,000.00

Public - County

Renovation

25

12

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
17
Bidding Soon
479
All Active Projects
128
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 13, 2024

August 12, 2024

August 15, 2025

img_map_placeholder

17262 Lark Ave, Mason City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.