BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Creston, Iowa. Completed plans call for the addition of a 30,000-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Project consists of the construction of an addition to the Creston Elementary School that is one-story in height, with a total area of approximately 30,000 square feet. Renovation of the existing administration area is also included. The work includes all General, Mechanical, and Electrical Work. Work on the Project shall commence as soon as possible after notice of the Contract and is currently scheduled for a substantial completion date on or before August 1, 2025, with Final Acceptance to be no later than ninety (90) days after substantial completion. Each Bidder shall accompany its bid with bid security in a separate, sealed envelope as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish within ten (10) days after the award of Contract a corporate Surety Bond, in a form acceptable to the Board of Directors of the Creston Community School District, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in an amount equal to five percent (5%) of the amount of the bid and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the Board of Directors of Creston Community School District. The bid shall contain no condition except as provided in the specifications. Bid security shall be made payable to Creston Community School District. The successful Bidder will be required to furnish within ten (10) days of the award proof of insurance as required by the Bid Documents and a Performance Bond and Labor and Material Payment Bond both in an amount equal to 100% of the Contract Price and in accordance with other requirements outlined in the Bid Documents. Minority and Targeted Small Business participation is encouraged. Bidders shall make a good faith documented effort to encourage the participation of Certified Iowa Targeted Small Business in accordance with the Code of Iowa. The right is reserved to reject any or all bids, or any part thereof, and to waive informalities as allowed by law, and to enter into such contract or contracts as shall be deemed in the best interests of Creston Community School District. Question Deadline 06/14/2024 Submit questions about Bidding Documents to the Architect-Engineer. Replies will be issued to Prime Bidders of record as Addenda to the Bidding Documents. Interpretations, corrections or changes of the Bidding Documents made in any other manner will not be binding and Bidders shall not rely upon them. The Architect-Engineer and the Owner will not be responsible for oral clarification. Questions received less than seventy-two (72) hours before the Bid opening cannot be answered.

Bid Results

Educational

$11,925,000.00

Public - City

Addition, Demolition, Renovation, Site Work

126

31

86

5

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
36
Bidding Soon
524
All Active Projects
213
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

July 1, 2024

img_map_placeholder

805 Academic Ave, Creston, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.