BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

Renovation of an educational facility in Mississauga, Ontario. Working plans call for the renovation of a educational facility.

Replacement of all the Air Conditioning Units (AC) in suites and condensing units on the rooftop of Roy Ivor Hall Pod A and B; Replacement of the existing Make up Air Units (MUA) on Pod A, B, C, & D, including supply air fan, heating coils, cooling coils, humidification etc. TIMELINE: Project is in design. Tender and construction timelines may be confirmed early 2026. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Final Planning

Educational

$900,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
212
Bidding Soon
5,008
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

3359 Mississauga Rd, Mississauga, ON


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.