BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a residential development in Port Alberni, British Columbia. Completed plans call for site work for a residential development.

The purpose of this Request for Proposal is to solicit submissions from qualified and experienced firms to replace up to 300 Existing water meters with 5/8" Kastrup water meters, provided by the city. Final number of units replaced will be based on budget and operational needs. The successful firm will be responsible to install water meters provided by the City, and responsibilities will include but are not limited to: Section A - Installation Locate existing meter and verify a functioning water shut off Document Serial numbers, size, and reading of outgoing and incoming meter. (paperwork provided by the city) to provide all record keeping requirements for the City records. Install new meter in home or pit meter box as required Test Meter for function and leaks Return all removed meters to City Works Yard Warranty of any issues directly resulting from the installation of the replacement meter for a 6-month period following project completion. (i.e. leaks). Section B - Contact with Homeowners and Communication with City Schedule appointments with homeowners at least 48 hours in advance. The City will provide a list of properties where replacements are to be installed. Make a minimum of three documented contact attempts with each residence/property owner (if necessary) using a combination of mail, in person canvassing of residences, door hanger notices, or phone calls. One of the three contact attempts must include provision of a written notice that contains the following information, at minimum: a) A general description of the process that will be undertaken to replace the meter. b) Contact information to make an appointment for the replacement of the meter. c) A clear indication that the water will be shut off to complete the replacement. d) A 24-hour emergency contact number to call for repair or malfunction of the meter following installation. Deliver a Final Notice letter(s) sent directly to the homeowners and tenants whom are unresponsive, noting the lack of response to previous contact attempts and instructing the owners to phone and book an appointment within a two-week time span. At this point, the Contractor will have fulfilled its contractual obligation for contact with that address. The City may assist in securing appointments with homeowners to facilitate completion of replacements at all properties identified for new meter installations. If the City assists in securing an appointment during the operational / installation phase of the contract, the Contractor will be required to fulfil the appointment. The City will provide support to the project manager on an on-going and timely basis (i.e. not held until the end of the project). Provide weekly progress reports to the City. Progress reports to include documented contact attempts for each property, addresses of installations completed, and addresses where installations are outstanding, and information regarding any special installations or outstanding items that require approvals or City action. Section C - General Identification must be carried and shown by all staff at each appointment. As designated prime contractor, the contractor will be responsible for site safety and compliance with all provincial and federal regulations. Contractor to ensure all employees entering private residences have a completed clear criminal record check. Section D - Qualifications Contractor must be a licensed journeyman plumber with Red Seal Certification. Proof of license must be submitted with the tender documents. Contractors must have experience with municipal water servicing. A minimum of two references are required.

Post-Bid

Residential Subdivision

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
9
Bidding Soon
394
All Active Projects
144
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2024

August 1, 2024

img_map_placeholder

Multiple Locations, Port Alberni, BC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.