BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Spokane, Washington. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; transportation facility; and water / sewer project.

The general nature of the Work is as follows: The Work includes demolition, site prep, grading, asphalt concrete paving, electrical, communications, stormwater, pavement markings, and all other work as noted on project plans for the expansion of Concourse C parking lot. Question Deadline 06/24/2024 at 4:30 PM PT Questions during the bid period and inquiries regarding bid results (after bid opening) should be directed to the Planning & Development Department of Spokane Airports, Monday through Friday, between 8:00 a.m. and 4:30 p.m. by contacting Joseph Hoeing at jhoeing@spokaneairports.net. A contract according to the General Conditions, Supplementary Conditions, and Addendums (if applicable) shall be signed prior to work commencing. Each bid must be accompanied by a cashier's check or surety bid bond, in an amount of not less than five percent (5%) of the total bid for all bid schedules (including sales tax). A performance bond, payment bond, and liability insurance in accordance with the contract documents will be required for the Contract. This is a prevailing wage project per applicable State Law. The Spokane Airport Board reserves the right to reject any and all bids, to waive any informality, to accept any alternate bids, and to make such award that it deems to be in the best interest of the Airport pursuant to the terms of the Instruction to Bidders and General Conditions. The contract will be awarded to the lowest responsive and responsible bidder. All bidders are cautioned to be aware of the requirement to have their bids considered responsive. Estimate Low:$5,000,000 Estimate High:$5,500,000 The Spokane International Airport Concourse C Parking Lot North Expansion project is part of a series of projects to expand the surface parking at Spokane International Airport. The airport plans to construct a new parking lot north of the existing Concourse C Parking Lot, as expanded last year. The project is located within the northeast quarter of Section 31 and the northwest quarter of Section 32 of Township 25 North, Range 42 East, east of Interstate 90, south of State Route 2, and north of Highway 902. In the existing condition, the portion of the site within the construction limits is undeveloped land with patches of prairie grasses, sage brush, and bare soil. The north half of the site is contained by the Arrivals Road to the airport terminal, W Airport Dr., and a new parking lot to the south. Runoff either enters the existing swale between W Airport Drive and the site or infiltrates in local depressions within the site. The project is not within a floodplain and there are no known flooding issues in the area. The eastern portion of the site is undeveloped. This will be developed in the future probably as additional parking. The project is an extension of the Concourse C Parking Lot project which was constructed in 2023. The Concourse C Parking Lot is located to the south of the current project site. The C Concourse Parking Lot North Expansion Project will install utility infrastructure required for the W McFarlane Road extension between old W Airport Drive and the realigned Airport Drive, an off-ramp from W Airport Drive Inbound, as well as pave and finish the Concourse C Parking Lot North Expansion. Future phases of work are anticipated to construct additional parking between the Concourse C Parking Lot North Expansion and inbound Airport Drive as well as connect the alignment of the expanded W McFarlane Road, constructed with this phase of the project, with the existing W McFarlane Road further east. Once this future work is completed, the Concourse C Parking Lot North Expansion will be combined with the existing Economy Parking Lot 1, creating one large Economy Parking Lot that is separated from t he C Concourse Parking Lot by W McFarlane Road. The Spokane International Airport Concourse CParking Lot North Expansion project is part of a series of projects to expand the surface parking at Spokane International Airport. The airport plansto construct a new parking lot north of the existing Concourse CParking Lot, asexpanded last year. The project is located within the northeast quarter of Section 31 and the northwest quarter of Section 32 of Township 25 North, Range 42 East, east of Interstate 90, south of State Route 2, and north of Highway 902. In the existing condition, the portion of the site within the construction limitsis undeveloped land with patches of prairie grasses, sage brush, and bare soil. The north half of the site iscontained by the Arrivals Road to the airport terminal, W Airport Dr., and a new parking lot to the south. Runoff either enters the existing swale between W Airport Drive and the site or infiltrates in local depressionswithin the site. The project is not within a floodplain and there are no known flooding issues in the area. The eastern portion of the site is undeveloped. This will be developed in the future probably as additional parking. The project is an extension of the Concourse CParking Lot project which was constructed in 2023. The Concourse C Parking Lot is located to the south of the current project site. The CConcourse Parking Lot North Expansion Project will install utility infrastructure required for the W McFarlane Road extension between old W Airport Drive and the realigned Airport Drive, an off-ramp from W Airport Drive Inbound, aswell as pave and finish the Concourse CParking Lot North Expansion. Future phasesof work are anticipated to construct additional parking between the Concourse CParking Lot North Expansion and inbound Airport Drive aswell as connect the alignment of the expanded W McFarlane Road, constructed with this phase of the project, with the existing W McFarlane Road further east. Once thisfuture work iscompleted, the Concourse CParking Lot North Expansion will be combined with the existing Economy Parking Lot 1, creating one large Economy Parking Lot that is separated from the CConcourse Parking Lot by W McFarlane Road. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Sidewalks / Parking Lot

$5,500,000.00

Public - City

Paving, Site Work

106

8

22

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
3
Bidding Soon
110
All Active Projects
35
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

August 1, 2024

img_map_placeholder

9000 W Airport Dr, Spokane, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.