BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Chamblee, Georgia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Runway 3r-21l Keel Replacement at the Dekalb Peachtree (PDK) Airport. Question Deadline 05/31/2024 at 5:00 PM ET All questions must be submitted to the Department of Purchasing and Contracting in writing via email to jhooper@dekalbcountyga.gov ONLY The term "Work" means the construction, labor, materials, equipment, tools, machinery, testing, temporary services and utilities, supervision, administration, coordination, planning, insurance, bonds, transportation, security, and all other services and things necessary to provide the County with the facilities, improvements, features, and functions in strict conformity with the General Requirements attached hereto as Attachment A, and as described in the Specifications and the Drawings included in the Bid Document Package. The Contractor agrees to complete the Work in a good, firm, substantial and workmanlike manner in strict conformity with this Contract. (1) The Work relates to the following Project: Runway 3R-21L Keel Replacement at the DeKalb Peachtree (PDK) Airport This project includes full-depth replacement of all pavement panels in the Keel (center 50-feet) and selected panels outside the Keel of Runway 3R-21L and remarking Runway 3R-21L in its entirety. Additive scope items include the full depth replacement of Taxiway Alpha between Runway 21L and Taxiway Juliet. The objective of this project is to replace the most distressed pavement panels on the primary runway and taxiway at PDK airport. The project work includes the following activities: full-depth Portland cement concrete pavement replacement, including recycled concrete base course and subgrade repair as needed, runway profile correction, grading and drainage improvements, lighting replacement, pavement marking, and erosion control. The overall project is being constructed in various phases to minimize the impact to airport operations. (2) Work not included in this Contract (if applicable): B. Unless otherwise stipulated, the Contractor shall furnish all of the Work in accordance with the Contract and all incidental work necessary to complete the Project in an acceptable manner, ready for use, occupancy, or operation by the County. The Contractor shall be responsible for the entire Work and every part thereof

Post-Bid

Transportation Terminals

$250,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
144
Bidding Soon
2,060
All Active Projects
929
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 18, 2024

July 18, 2024

October 31, 2024

img_map_placeholder

2000 Airport Rd, Chamblee, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.