BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, new construction and renovation of a municipal facility in Stockton, California. Completed plans call for the construction of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.

PHASE 1 SITE PREPARATION FOR THE NEW ADOPTION/CLINIC BUILDING: UPGRADE OF THE SHELTER'S EXISTING ELECTRICAL SERVICE, REALIGNMENT OF UNDERGROUND UTILITIES CURRENTLY UNDER THE NEW ADOPTION/CLINIC SITE, INSTALLATION OF A NEW VEHICULAR GATE AND PERSON GATE SERVING THE OVERALL PUBLIC WORKS COMPLEX. PHASE 2 - CONSTRUCT AN APPROXIMATE 8071 SF ONE STORY ADOPTION/CLINIC BUILDING AND RELATED COMPONENTS: A NEW ADOPTION/CLINIC BUILDING, PARTIAL NEW EXTERIOR FACADE ON A PORTION OF THE EXISTING 1960'S SHELTER, RELATED SITE WORK. PHASE 3 - NON-STRUCTURAL INTERIOR REMODELING OF APPROXIMATELY 1810 SF WITHIN THE EXISTING STEEL (PRE-ENGINEERED) ANIMAL HOLDING BUILDING: RENOVATION AND CONVERSION OF AN APPROXIMATE 1024 SF AREA IN THE NORTHEAST CORNER OF THE EXISTING BUILDING, RENOVATION OF AN APPROXIMATE 750 SF DOG ISOLATION ROOM #501 ADD ALTERNATES INCLUDE: ADD ALT 1 - DOG ISOLATION AND REHAB RM #501 IN THE EXISTING STEEL KENNEL BUILDING - PHASE 1 NEW PLUMBING, CONCRETE SLAB, DOORS AND RELATED WORK ONLY. ADD ALT 2 - DOG ISOLATION AND REHAB RM #501 PHASE 2 - NEW CEILING, LIGHTING & HVAC. ADD ALT. 3 - REPURPOSE/REMODEL OF THE EXISTING PORTABLE BUILDINGS - THIS WORK IS TO BE PERFORMED WITHIN A $50,000 TOTAL ALLOWANCE. THE SCOPE OF WORK WILL BE WORKED OUT WITH THE SELECTED CONTRACTOR TO FIT WITHIN THE $50,000 ALLOWANCE. THE ALLOWANCE WILL INCLUDE ALL COSTS INCLUDING CONTRACTOR GENERAL CONDITIONS AND PROFIT AND OVERHEAD. ADD ALT 4 - PAINT EXISTING SHELTER BUILDING - THIS WORK INCLUDES PAINTING ALL PORTIONS OF THE CURRENTLY PAINTED EXISTING SHELTER BUILDINGS THAT WILL REMAIN. Requests for Clarification: Shall be submitted in writing by 5:00 p.m., at least one week prior to bid opening date.

Post-Bid

Municipal

$8,200,000.00

Public - City

New Construction, Renovation, Site Work

186

66

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
92
Bidding Soon
1,926
All Active Projects
803
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2024

October 7, 2024

img_map_placeholder

1575 S Lincoln St, Stockton, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.